Gate Review Crosswalk
How readiness evidence supports the readiness-for-service reviews that governments already run on major projects.
The gate already exists
Many governments review a major project shortly before it goes live. The review has different names: readiness for service, go-live, handover, transition to operations. Each asks a version of the same question. Is this asset, and the organization that will run it, ready to enter service?
The review comes late. By the time it is held, systems have been tested or not, the operating organization has been recruited and trained or not, and procedures have been written or not. A review team can report what is missing, but there is little time left to fix it.
The ICxA readiness criteria describe the evidence that answers the gate’s question. Most of that evidence can be examined long before the last gate.
What readiness covers
Readiness is the condition in which sufficient evidence is available for a decision to proceed. It applies at every point of commitment in a project, not only at the end: readiness to commit, to proceed, to integrate and to operate.
It covers the asset and its systems, which must be designed, procured, built, tested and integrated so that each system works with the others. It covers the organization that will operate the asset: its people, its organization, its care of the asset, and its systems and processes. It also covers the interfaces and contracts between the parties, and the evidence and governance on which each decision rests.
What can be checked before the last gate
- At the investment decision and through engineering, the path. Operating outcomes are defined. Stage-gates, criteria and evidence needs are set in advance. Roles and independence are assigned.
- During procurement and construction, the progression. Systems are being completed and tested by system. Interfaces and vendor deliverables are tracked. The operating organization is developing on time.
- From commissioning to operations, the condition. Systems work together. Deficiencies and deferred work are controlled. Each transfer to the operator follows a recorded review and acceptance.
A crosswalk for your gate framework
A crosswalk maps each area of a published gate review to the ICxA readiness criteria that relate to it, and shows the earliest stage at which the evidence exists. ICxA has prepared crosswalks for several government gate frameworks and will prepare one for any assurance body that asks. The mapping is ICxA’s reading of the published guidance, and the gate owner’s own guidance governs its reviews.
Each crosswalk below is a short PDF for one published gate framework.
United Kingdom
New South Wales
Victoria
Canada
The criteria the crosswalks refer to are set out in full in the Readiness Audit Criteria.
Terms of use for public bodies
Public bodies acting in an oversight role, including government project assurance bodies, audit offices, regulators and parliamentary committees, may use, cite and reproduce this material without charge and without ICxA membership, with attribution to the Institute of Commissioning & Assurance. ICxA membership is required to state publicly that an organization, service or assessment is aligned with the ICxA Standards, to hold ICxA credentials, and to use this material in a commercial service.
Next steps
The Missing Measure
A short brief on why scope, schedule and budget do not show whether an asset will operate.
Access the ICxA Standards
The free Corporate Preview membership gives your organization the Standards in full. No card and no expiry.
Talk to ICxA
Ask for the crosswalk to your own gate guidance, or arrange a briefing for your review teams.