Body of Knowledge
THE ICxA BODY OF KNOWLEDGE
Put Outcome Assurance, Commissioning, and Operational Readiness into practice
Build clearer plans, stronger evidence, and better-informed decisions throughout the transition from project delivery to operation.
Find practical guidance, worked examples, procedures, checklists, templates, and tools to help you apply the ICxA standards to real project challenges.
SUPPORT FOR THE WORK YOU DO
What you get, and how it helps
Move from understanding a requirement to preparing the plan, evidence, or record needed to apply it. The BoK connects the three disciplines in one working library.
Practical guidance
Work through a method, understand what to consider, and identify the records to prepare.
Templates and registers
Start with a structured document or workbook and adapt released resources to your project within the applicable licence.
Crosswalks and self-assessments
Connect your project practices to standards clauses and identify gaps requiring attention.
Worked examples
See how responsibilities, evidence, exceptions, and decisions fit together through a project.
Navigation and shared terminology
Find a starting point for your role and establish a common language across teams.
Industry applications
Work from a complete pack for each of 23 industries: start-here guides, system guides, checklist sets, templates, a standards and regulatory map, and a worked project from first decision to stable operation.
The BoK provides informative implementation guidance. The issued ICxA standards remain the authority for requirements. Access and use are governed by your membership and the applicable licence.
THE COMPLETE KNOWLEDGE FRAMEWORK
Seven branches. One connected approach.
Explore the breadth of the collection, from the foundations of outcome governance to sector-specific application. Counts cover the complete catalogue, and every resource listed is released to members.
22 catalogue entries
Foundational Background
Understand the framework
Standards architecture, decision boundaries, systems thinking, glossary, crosswalks, and worked examples.
Explore this branch →54 catalogue entries
Outcome Assurance
Make informed outcome decisions
Define outcomes and evidence needs, establish assurance governance, evaluate evidence, and address residual risk.
Explore this branch →140 catalogue entries
Commissioning
Plan and control the transition
Connect strategy, systemization, engineering, completion, testing, start-up, and handover.
Explore this branch →51 catalogue entries
Operational Readiness
Prepare the operation to perform
Assess people, organization, assets, systems, and processes before operational transfer and stabilization.
Explore this branch →12 catalogue entries
Digital Technologies and AI
Use digital tools with confidence
Govern digital records, completions systems, AI-assisted work, OT cybersecurity, digital twins, and software configuration.
Explore this branch →11 catalogue entries
Professional Practice
Build stronger professional practice
Develop governance, leadership, management, lessons learned, and continuous improvement.
Explore this branch →1,356 catalogue entries
Industry Applications
Apply the methods in your sector
Find sector-specific guidance, system resources, procedures, checklist sets, and case studies across 23 industries.
Explore this branch →Industry coverage
Data Centers · Mining · Power · Water-Wastewater · Oil & Gas · Transportation · Buildings & Healthcare · Hydrogen & Low-Carbon Fuels · Nuclear · Life Sciences · Advanced Manufacturing · Chemicals, Polymers & Industrial Gases · Metals Production & Mineral Refining · Pulp, Paper & Forest Products · Cement, Lime, Glass & Building Materials · Food, Beverage & Agri-Processing · Logistics, Warehousing & Cold Chain · Telecommunications & Networks · Shipbuilding, Marine Vessels & Offshore Units · Carbon Capture, Transport & Storage · Waste, Recycling & Bioenergy · District Energy & Thermal Networks · Defence & Government Facilities
SEE THE PRACTICAL DEPTH
Resources built around real project decisions
These examples show the practical depth of the released collection.
ICXA-32145 · Released
Commissioning Acceptance Criteria
Establish clear criteria before testing. Work through conditions, tolerances, approval, and results that fall outside the agreed criteria.
View catalogue entry →ICXA-33130 · Released
Operational Readiness Decision Package
Bring readiness claims, supporting evidence, open issues, conditions, and acceptance positions together for a review.
View catalogue entry →ICXA-30350 · Released
End-to-End Worked Project
Follow a water treatment project through requirements, commissioning, readiness, and authorization, including a hold and a deferred decision.
View catalogue entry →FIND THE RESOURCE YOU NEED
Explore the complete BoK catalogue
Search the complete catalogue by document number, title, or topic. Filter by branch, sector or section, resource type, or intended use.
Foundational Background 22 resources
| Resource | Type / format | Sector or section |
|---|---|---|
| ICXA-30010Master Index and User GuideReading reference | NavigationPDF | General |
| ICXA-30020Consolidated Glossary and Legacy-Term MapReading reference | ReferencePDF | General |
| ICXA-30040Body of Knowledge Authoring, Review and Release ProcedureWorking resource | ProcedurePDF | General |
| ICXA-30110Outcome Governance versus Delivery GovernanceReading reference | PrimerPDF | General |
| ICXA-30120The ICxA Standards ArchitectureReading reference | PrimerPDF | General |
| ICXA-30130Decision BoundariesReading reference | PrimerPDF | General |
| ICXA-30140Capital Project ComplexityReading reference | PrimerPDF | General |
| ICXA-30150The Capital Project Lifecycle and Where Outcomes Are DecidedReading reference | PrimerPDF | General |
| ICXA-30160Why Projects Fail at the Transition to OperationsReading reference | PrimerPDF | General |
| ICXA-30170Project Finance Fundamentals for PractitionersReading reference | PrimerPDF | General |
| ICXA-30180Construction and Start-Up Insurance Fundamentals for PractitionersReading reference | PrimerPDF | General |
| ICXA-30190Delivery Models and Contract Fundamentals for PractitionersReading reference | PrimerPDF | General |
| ICXA-30200Systems Thinking for Capital ProjectsReading reference | PrimerPDF | System Thinking |
| ICXA-30210Commissioning Under ComplexityReading reference | GuidePDF | Complexity |
| ICXA-30220The Temporary Commissioning OrganizationReading reference | GuidePDF | Organization Theory |
| ICXA-30230Applying Risk-Informed Decision-Making Across Commissioning and Outcome AssuranceReading reference | GuidePDF | Risk Decision-Making |
| ICXA-30240Roles, Responsibilities and Team IntegrationReading reference | GuidePDF | Roles & Responsibilities |
| ICXA-30310ICXA-10001 Clause Crosswalk and Self-AssessmentWorking resource | ToolXLSX + PDF | General |
| ICXA-30320ICXA-10002 Clause Crosswalk and Self-AssessmentWorking resource | ToolXLSX + PDF | General |
| ICXA-30330ICXA-20101 Clause Crosswalk and Self-AssessmentWorking resource | ToolXLSX + PDF | General |
| ICXA-30340ICXA-20201 Clause Crosswalk and Self-AssessmentWorking resource | ToolXLSX + PDF | General |
| ICXA-30350End-to-End Worked ProjectReading reference | Worked examplePDF | General |
Outcome Assurance 54 resources
| Resource | Type / format | Sector or section |
|---|---|---|
| ICXA-31010Navigating the Outcome Assurance Body of KnowledgeReading reference | NavigationPDF | Management |
| ICXA-31110Establishing and Governing the Outcome Assurance SystemReading reference | GuidePDF | Management |
| ICXA-31115Defining and Governing Outcome Stage-Gates Across the LifecycleReading reference | GuidePDF | Management |
| ICXA-31120Building and Maintaining the Outcome Assurance CaseReading reference | GuidePDF | Management |
| ICXA-31125Establishing and Safeguarding Outcome Assurance IndependenceReading reference | GuidePDF | Management |
| ICXA-31130Planning and Demonstrating Outcome Assurance CompetenceReading reference | GuidePDF | Management |
| ICXA-31135Outcome Assurance Awareness and CommunicationReading reference | GuidePDF | Management |
| ICXA-31140Authorizing Multi-System Outcomes and InterfacesReading reference | GuidePDF | Management |
| ICXA-31145Non-Authorization, Deferral and ReconsiderationReading reference | GuidePDF | Management |
| ICXA-31150Managing Changes Affecting Outcome AuthorizationReading reference | GuidePDF | Management |
| ICXA-31155Managing Nonconforming Outcomes and Corrective ActionReading reference | GuidePDF | Management |
| ICXA-31160Assumptions and Residual Uncertainty in Outcome AssuranceReading reference | GuidePDF | Management |
| ICXA-31165Monitoring Outcome Assurance PerformanceReading reference | GuidePDF | Management |
| ICXA-31170Conducting Outcome Assurance Management ReviewsReading reference | GuidePDF | Management |
| ICXA-31180Outcome Assurance in Front-End DevelopmentReading reference | GuidePDF | Management |
| ICXA-31185In-Service Assurance After AuthorizationReading reference | GuidePDF | Management |
| ICXA-31190Outcome Assurance for Portfolios and ProgrammesReading reference | GuidePDF | Management |
| ICXA-31210Defining Outcomes and Outcome RequirementsReading reference | GuidePDF | Defining Outcomes |
| ICXA-31220Interested-Party Conditions in Outcome AssuranceReading reference | GuidePDF | Defining Outcomes |
| ICXA-31230Writing Measurable Outcome Requirements and Performance EnvelopesReading reference | GuidePDF | Defining Outcomes |
| ICXA-31240Setting Readiness Criteria at Financial CloseReading reference | GuidePDF | Defining Outcomes |
| ICXA-31310Determining and Governing Outcome Evidence NeedReading reference | GuidePDF | Evidence |
| ICXA-31320Evaluating Outcome Evidence SufficiencyReading reference | GuidePDF | Evidence |
| ICXA-31330Evidence Types, Strength and Limitations: A Practitioner LibraryReading reference | GuidePDF | Evidence |
| ICXA-31340Outcome Evidence Need: Worked Examples by Stage-GateReading reference | GuidePDF | Evidence |
| ICXA-31410Auditing the Outcome Assurance SystemReading reference | GuidePDF | Auditing |
| ICXA-31510Residual Risk at Outcome AuthorizationReading reference | GuidePDF | Residual Risk |
| ICXA-31610Integrating Outcome Assurance with Lender Technical Due DiligenceReading reference | GuidePDF | Project Finance/Lending |
| ICXA-31620Integrating Outcome Assurance with Insurance Risk EngineeringReading reference | GuidePDF | Project Finance/Insurance |
| ICXA-31630Completion Tests and the Independent Engineer InterfaceReading reference | GuidePDF | Project Finance/Lending |
| ICXA-31640Readiness Evidence for Lenders: The Evidence Set and How to Read ItReading reference | GuidePDF | Project Finance/Lending |
| ICXA-31650Start-Up Delay and Delay-in-Start-Up EvidenceReading reference | GuidePDF | Project Finance/Insurance |
| ICXA-31660Testing and Commissioning Risk Evidence for UnderwritersReading reference | GuidePDF | Project Finance/Insurance |
| ICXA-31710Selecting a Standard Contract Form for Outcome-Governed ProjectsReading reference | GuidePDF | Contract Forms |
| ICXA-31720Capturing Completion-by-System, Testing and Readiness Requirements in ContractsReading reference | GuidePDF | Contract Forms |
| ICXA-31730Applying the ICxA Standards under FIDIC FormsReading reference | GuidePDF | Contract Forms/FIDIC |
| ICXA-31740Applying the ICxA Standards under NEC FormsReading reference | GuidePDF | Contract Forms/NEC |
| ICXA-31750Applying the ICxA Standards under EJCDC FormsReading reference | GuidePDF | Contract Forms/EJCDC |
| ICXA-31760Applying the ICxA Standards under CCDC FormsReading reference | GuidePDF | Contract Forms/CCDC |
| ICXA-31810Outcome Director HandbookReading reference | HandbookPDF | Roles |
| ICXA-31820Outcome Auditor HandbookReading reference | HandbookPDF | Roles |
| ICXA-31830Appointment and Qualification Routes for Outcome Directors and Outcome AuditorsReading reference | GuidePDF | Roles |
| ICXA-51010Outcome Policy - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51020Outcome Obligation and Outcome Requirements RegisterWorking resource | ToolXLSX | Templates |
| ICXA-51030Outcome Stage-Gate Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51040Outcome Evidence Need Determination - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51050Outcome Assurance Case - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51060Outcome Risk RegisterWorking resource | ToolXLSX | Templates |
| ICXA-51070Outcome Change Control Record - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51080Outcome Auditor Evidence Evaluation Report - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51090Outcome Authorization Decision Record - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51100Independence and Conflict Declaration - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-51110Outcome Assurance Internal Audit ChecklistWorking resource | ToolXLSX | Templates |
| ICXA-51120Outcome Assurance Management Review Record - TemplateWorking resource | TemplateDOCX | Templates |
Commissioning 140 resources
| Resource | Type / format | Sector or section |
|---|---|---|
| ICXA-001Phases of the Commissioning ProcessReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-002TerminologyReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-003Roles & ResponsibilitiesReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-004Commissioning Strategy & PlanningReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-005Commissioning Engineering, Manufacturing, Construction CompletionsReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-006On-Site TestingReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-007Handover, In-Service, CloseoutReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-008Safety & Risk ManagementReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-009Lessons Learned & Continuous ImprovementReading reference | Implementation GuidePDF | Implementation Guide |
| ICXA-32010Navigating the Commissioning Body of KnowledgeReading reference | NavigationPDF | Management |
| ICXA-32110Integrating Commissioning into Design and EngineeringReading reference | GuidePDF | Planning |
| ICXA-32115Controlling the PCP to CEP TransitionReading reference | GuidePDF | Planning |
| ICXA-32120Developing and Governing a Commissioning Division of ResponsibilityReading reference | GuidePDF | Planning |
| ICXA-32125Tailoring Commissioning Governance to Project Scale, Risk and ComplexityReading reference | GuidePDF | Planning |
| ICXA-32130Planning and Releasing Commissioning Work PackagesReading reference | GuidePDF | Planning |
| ICXA-32135Commissioning Schedules and Readiness ForecastsReading reference | GuidePDF | Planning |
| ICXA-32140Commissioning Cost Forecasts and ContingencyReading reference | GuidePDF | Planning |
| ICXA-32145Defining and Governing Commissioning Acceptance CriteriaReading reference | GuidePDF | Planning |
| ICXA-32150Planning and Demonstrating Commissioning CompetenceReading reference | GuidePDF | Planning |
| ICXA-32155Funding and Commercial Milestone Interfaces at Commissioning Stage-GatesReading reference | GuidePDF | Planning |
| ICXA-32160Developing the Commissioning Strategy and Project Commissioning PlanReading reference | GuidePDF | Planning |
| ICXA-32165Commissioning Scope in Tenders, Contracts and Vendor PackagesReading reference | GuidePDF | Planning |
| ICXA-32170Estimating Commissioning Cost, Duration and ResourcesReading reference | GuidePDF | Planning |
| ICXA-32175Organizing and Staffing the Commissioning TeamReading reference | GuidePDF | Planning |
| ICXA-32210Project Systemization GuidelineReading reference | GuidePDF | Systemization |
| ICXA-32305Conducting Commissioning Stage-Gate Readiness ReviewsReading reference | GuidePDF | Management |
| ICXA-32310Conducting a Pre-Start-Up Safety ReviewReading reference | GuidePDF | Management |
| ICXA-32315Managing Commissioning Interfaces and DecisionsReading reference | GuidePDF | Management |
| ICXA-32320Commissioning Meetings, Decisions and ActionsReading reference | GuidePDF | Management |
| ICXA-32325Commissioning Performance Measurement and ReportingReading reference | GuidePDF | Management |
| ICXA-32330Commissioning Assurance and SurveillanceReading reference | GuidePDF | Management |
| ICXA-32335Commissioning Resource Readiness and MobilizationReading reference | GuidePDF | Management |
| ICXA-32340Commissioning Deficiencies Through Stage-Gates and HandoverReading reference | GuidePDF | Management |
| ICXA-32345Commissioning Changes, Retest and Evidence ValidityReading reference | GuidePDF | Management |
| ICXA-32350Hold, Witness, Review and Release Points Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32355SIMOPS and Control of Work During CommissioningReading reference | GuidePDF | Management |
| ICXA-32360Hazardous-Energy Isolation During CommissioningReading reference | GuidePDF | Management |
| ICXA-32365Liven-Up Notices Through Commissioning TransitionsReading reference | GuidePDF | Management |
| ICXA-32370Overrides, Inhibits, Bypasses and Jumpers Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32375Temporary Systems Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32380Commissioning in Operating FacilitiesReading reference | GuidePDF | Management |
| ICXA-32385Commissioning Shift Handover and Operational CommunicationsReading reference | GuidePDF | Management |
| ICXA-32390Commissioning Incidents and Near MissesReading reference | GuidePDF | Management |
| ICXA-32395Emergency-Response Readiness Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32400Environmental Readiness Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32405Regulatory Readiness Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32410Alarm-System Readiness Through Commissioning and Start-UpReading reference | GuidePDF | Management |
| ICXA-32415Equipment Preservation and Cleanliness Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32420First Fills, Chemicals and Consumables Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32425Vendor Package Readiness Through CommissioningReading reference | GuidePDF | Management |
| ICXA-32510Developing and Governing System Commissioning ProceduresReading reference | GuidePDF | Procedures |
| ICXA-32520Planning and Controlling Commissioning Start-UpReading reference | GuidePDF | Procedures |
| ICXA-32530Pre-Commissioning: Flushing, Chemical Cleaning, Blowing and DryingReading reference | GuidePDF | Procedures |
| ICXA-32540Pressure and Leak Testing Through Construction CompletionReading reference | GuidePDF | Procedures |
| ICXA-32550Loop Checking and Instrument CommissioningReading reference | GuidePDF | Procedures |
| ICXA-32560Electrical Energization: From Ready for Energization to Live SystemsReading reference | GuidePDF | Procedures |
| ICXA-32570Commissioning Control Systems and Safety Instrumented SystemsReading reference | GuidePDF | Procedures |
| ICXA-32580Commissioning Rotating EquipmentReading reference | GuidePDF | Procedures |
| ICXA-32610Planning and Governing Commissioning Test CampaignsReading reference | GuidePDF | Testing |
| ICXA-32615Planning and Governing Factory and Integrated Factory Acceptance TestingReading reference | GuidePDF | Testing |
| ICXA-32620Planning and Conducting Static CommissioningReading reference | GuidePDF | Testing |
| ICXA-32625Planning and Conducting Dynamic CommissioningReading reference | GuidePDF | Testing |
| ICXA-32630Planning and Conducting Performance VerificationReading reference | GuidePDF | Testing |
| ICXA-32635Trial Operation and Reliability ProvingReading reference | GuidePDF | Testing |
| ICXA-32640Protective Function Verification Through CommissioningReading reference | GuidePDF | Testing |
| ICXA-32645Controlling Measurement Validity and Calibration in CommissioningReading reference | GuidePDF | Testing |
| ICXA-32650Controlling Commissioning Test EvidenceReading reference | GuidePDF | Testing |
| ICXA-32655Investigating Failed and Unexpected Commissioning Test ResultsReading reference | GuidePDF | Testing |
| ICXA-32660Post-Test Reinstatement and Return to ServiceReading reference | GuidePDF | Testing |
| ICXA-32665Remote and Hybrid Commissioning VerificationReading reference | GuidePDF | Testing |
| ICXA-32680Integrated Systems TestingReading reference | GuidePDF | Testing |
| ICXA-32690Commissioning Modular and Offsite-Built ScopeReading reference | GuidePDF | Testing |
| ICXA-32710Verifying Construction Completion and Transfer to CommissioningReading reference | GuidePDF | Turnover |
| ICXA-32720Controlling the System Handover DossierReading reference | GuidePDF | Turnover |
| ICXA-32730Controlling Red-Line and As-Built Information Through Commissioning and HandoverReading reference | GuidePDF | Turnover |
| ICXA-32740Closing Out Commissioning and Transferring Execution KnowledgeReading reference | GuidePDF | Turnover |
| ICXA-32810Selecting, Adapting and Governing Commissioning TemplatesReading reference | GuidePDF | Templates |
| ICXA-32820Adapting and Governing Inspection Test Record TemplatesReading reference | GuidePDF | Checklist Templates |
| ICXA-52010Project Commissioning Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52020Commissioning Execution Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52030Commissioning Execution Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52040Commissioning Readiness Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52050Commissioning Oversight Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52060Commissioning Sequence & Schedule Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52070Project Systematization Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52080Interface Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52090Resource Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52100Meeting Reporting Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52110Master Document Register - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52120CMS Software Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52130Commissioning Budget Cost Control Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52140Commissioning Budget Contingency Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52150Vendor Contractor Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52160Vendor Contractor Performance Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52170FAT IFAT Attendance Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52180Cleanliness & Preservation Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52190Cleanliness Preservation Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52200First Fills & Consumables Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52210Temporary Equipment Spares Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52220Safe Transition Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52230Simultaneous Operations (SIMOPS) - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52240Hazard & Operability Studies (HAZOP) - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52250Pre-Startup Safety Review (PSSR) - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52260Emergency Response Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52270Regulatory Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52280Alarm Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52290LUN Template - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52300A-ITR - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52310B-ITR - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52320Dynamic Commissioning Procedure - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52330Performance Guarantee Monitoring Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52340Punchlist Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52350Handover Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52360System Handover Management Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52370Turnover Dossier - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52390Commissioning Progress Report - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52400Commissioning Closeout Report - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52410Lessons Learned Meeting Agenda - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52420Root Cause Analysis Report - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52500Division of Responsibility Matrix - EPC Executes CommissioningWorking resource | ToolXLSX | Templates |
| ICXA-52510Division of Responsibility Matrix - Owner Executes CommissioningWorking resource | ToolXLSX | Templates |
| ICXA-52520System Commissioning Procedure - Template (Single Equipment Package)Working resource | TemplateDOCX | Procedures |
| ICXA-52600System Breakdown Structure RegisterWorking resource | ToolXLSX | Templates |
| ICXA-52610Interface RegisterWorking resource | ToolXLSX | Templates |
| ICXA-52620Commissioning Stage-Gate Readiness Review Record - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52630Construction Completion Certificate - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52640Ready for Energization Certificate - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52650Ready for Dynamic Commissioning Certificate - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52660Ready for Start-Up Certificate - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52670System Handover Certificate and Limit of System Handover Statement - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52680Deficiency RegisterWorking resource | ToolXLSX | Templates |
| ICXA-52690Test Evidence IndexWorking resource | ToolXLSX | Templates |
| ICXA-52700System Commissioning Procedure - Template (Integrated System) - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52710Integrated Systems Test Procedure - Template - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52720Commissioning Schedule and Sequence Logic - TemplateWorking resource | ToolXLSX | Templates |
| ICXA-52730Commissioning Performance DashboardWorking resource | ToolXLSX | Templates |
| ICXA-52740Division of Responsibility Matrix - EPCM ModelWorking resource | ToolXLSX | Templates |
| ICXA-52750Division of Responsibility Matrix - Alliance and Progressive Design-BuildWorking resource | ToolXLSX | Templates |
| ICXA-52760Handover Change Request - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-52900Inspection Test Record Library IndexWorking resource | ToolXLSX | Templates |
Operational Readiness 51 resources
| Resource | Type / format | Sector or section |
|---|---|---|
| ICXA-33010Navigating the Operational Readiness Body of KnowledgeReading reference | NavigationPDF | OR Programs |
| ICXA-33110Establishing and Maintaining the Operational Readiness CharterReading reference | GuidePDF | OR Programs |
| ICXA-33115Operational Readiness Planning and ControlReading reference | GuidePDF | OR Programs |
| ICXA-33120Defining and Controlling Operational Readiness CriteriaReading reference | GuidePDF | OR Programs |
| ICXA-33125Managing Operational Readiness Risks, Gaps and ConditionsReading reference | GuidePDF | OR Programs |
| ICXA-33130Building and Maintaining the Operational Readiness Decision PackageReading reference | GuidePDF | OR Programs |
| ICXA-33135Conducting Operational Readiness Reviews and Issuing Readiness RecommendationsReading reference | GuidePDF | OR Programs |
| ICXA-33140Transfer of Operational ControlReading reference | GuidePDF | OR Programs |
| ICXA-33145Maintaining and Revalidating Readiness During Delayed Operational TransferReading reference | GuidePDF | OR Programs |
| ICXA-33150Ramp-Up and Stabilization After TransferReading reference | GuidePDF | OR Programs |
| ICXA-33155Demonstrating Operational Resilience and Recovery Readiness at TransferReading reference | GuidePDF | OR Programs |
| ICXA-33160Auditing the Operational Readiness Management SystemReading reference | GuidePDF | OR Programs |
| ICXA-33165Conducting Operational Readiness Management ReviewsReading reference | GuidePDF | OR Programs |
| ICXA-33170Operational Readiness in Front-End DevelopmentReading reference | GuidePDF | OR Programs |
| ICXA-33175Estimating and Budgeting Operational ReadinessReading reference | GuidePDF | OR Programs |
| ICXA-33180Operational Readiness for Brownfield and Expansion ProjectsReading reference | GuidePDF | OR Programs |
| ICXA-33210Operational Competence at TransferReading reference | GuidePDF | People |
| ICXA-33220Planning and Demonstrating Operational Workforce Capacity and ResilienceReading reference | GuidePDF | People |
| ICXA-33230Validating Human-Performance Assumptions for Operational TransferReading reference | GuidePDF | People |
| ICXA-33240Operations Staffing and Recruitment PlanningReading reference | GuidePDF | People |
| ICXA-33250Building the Training and Competency ProgrammeReading reference | GuidePDF | People |
| ICXA-33310Organizational Readiness at TransferReading reference | GuidePDF | Organization |
| ICXA-33320Demonstrating Physical Security Readiness for Operational TransferReading reference | GuidePDF | Organization |
| ICXA-33330Designing the Operating ModelReading reference | GuidePDF | Organization |
| ICXA-33340Health, Safety and Environmental Management System ReadinessReading reference | GuidePDF | Organization |
| ICXA-33350Permit-to-Operate and Regulatory ReadinessReading reference | GuidePDF | Organization |
| ICXA-33410Asset Readiness at TransferReading reference | GuidePDF | Asset |
| ICXA-33420Preparing Critical Supplies and External Support for Operational TransferReading reference | GuidePDF | Asset |
| ICXA-33430Operations Input to Design: Operability and Maintainability ReviewsReading reference | GuidePDF | Asset |
| ICXA-33440Spares Strategy and Initial InventoryReading reference | GuidePDF | Asset |
| ICXA-33450Operations and Maintenance Contracts and Service AgreementsReading reference | GuidePDF | Asset |
| ICXA-33510Demonstrating Operating Process and Information Readiness at TransferReading reference | GuidePDF | Systems & Processes |
| ICXA-33520Operating Procedures Ready for TransferReading reference | GuidePDF | Systems & Processes |
| ICXA-33530Preparing Operational Enabling Systems for TransferReading reference | GuidePDF | Systems & Processes |
| ICXA-33540Preparing Maintenance and Work Management for Operational TransferReading reference | GuidePDF | Systems & Processes |
| ICXA-33550Demonstrating Control Room Readiness for Operational TransferReading reference | GuidePDF | Systems & Processes |
| ICXA-33560Controlling Operational Configuration Through Transfer and StabilizationReading reference | GuidePDF | Systems & Processes |
| ICXA-33570Controlling Operational Readiness Records and KnowledgeReading reference | GuidePDF | Systems & Processes |
| ICXA-33580Building the Maintenance System and Asset DataReading reference | GuidePDF | Systems & Processes |
| ICXA-53010Operational Readiness Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53020Readiness Charter - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53030Readiness Envelope Definition - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53040Readiness Criteria RegisterWorking resource | ToolXLSX | Templates |
| ICXA-53050Readiness Risk and Gap RegisterWorking resource | ToolXLSX | Templates |
| ICXA-53060Operational Readiness Decision Package - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53070Readiness Review Record and Readiness Recommendation - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53080Operational Acceptance Record - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53090Transfer of Operational Control Record - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53100Ramp-Up and Stabilization Plan - TemplateWorking resource | TemplateDOCX | Templates |
| ICXA-53110Competence Matrix and Demonstration RecordWorking resource | ToolXLSX | Templates |
| ICXA-53120Operational Readiness Self-AssessmentWorking resource | ToolXLSX | Templates |
Digital Technologies and AI 12 resources
| Resource | Type / format | Sector or section |
|---|---|---|
| ICXA-34010Navigating the Digital Technologies and AI Body of KnowledgeReading reference | NavigationPDF | Management |
| ICXA-34110Digital Commissioning RecordsReading reference | GuidePDF | Management |
| ICXA-34120AI-Assisted Commissioning Evidence and DecisionsReading reference | GuidePDF | Management |
| ICXA-34130OT Cybersecurity Readiness During CommissioningReading reference | GuidePDF | Management |
| ICXA-34140Digital Twins Through Commissioning and Operational TransferReading reference | GuidePDF | Management |
| ICXA-34150Asset Information HandoverReading reference | GuidePDF | Management |
| ICXA-34160Simulation and Operator Training SystemsReading reference | GuidePDF | Management |
| ICXA-34170Completions Analytics and Readiness DashboardsReading reference | GuidePDF | Management |
| ICXA-34210Selecting and Governing a Completions Management SystemReading reference | GuidePDF | Software |
| ICXA-34220Commissioning Software Configuration and ReleaseReading reference | GuidePDF | Software |
| ICXA-34230Implementing the Open Completion and Readiness Protocol (OCRS)Reading reference | GuidePDF | Software |
| ICXA-34240Implementing the Outcome Assurance Protocol (OAP)Reading reference | GuidePDF | Software |
Professional Practice 11 resources
| Resource | Type / format | Sector or section |
|---|---|---|
| ICXA-35010Navigating the Professional Practice Body of KnowledgeReading reference | NavigationPDF | Management |
| ICXA-35110Governance of Commissioning, Readiness and Outcome DecisionsReading reference | GuidePDF | Governance |
| ICXA-35120Leadership in Commissioning and AssuranceReading reference | GuidePDF | Leadership |
| ICXA-35130Managing Commissioning and Assurance WorkReading reference | GuidePDF | Management |
| ICXA-35140Lessons Learned: Capture, Verification and ReuseReading reference | GuidePDF | Lessons Learned |
| ICXA-35150Continuous Improvement of Commissioning and Assurance PracticeReading reference | GuidePDF | Continuous Improvement |
| ICXA-35210Ethics and Professional ConductReading reference | GuidePDF | Ethics |
| ICXA-35220Independence and Conflicts of Interest in PracticeReading reference | GuidePDF | Ethics |
| ICXA-35230Competency Framework and Credential PathwaysReading reference | GuidePDF | Competency |
| ICXA-35240Building a Commissioning and Assurance FunctionReading reference | GuidePDF | Management |
| ICXA-35250Commercial Awareness for Commissioning and Assurance PractitionersReading reference | GuidePDF | Management |
Industry Applications 1,356 resources
| Resource | Type / format | Sector or section |
|---|---|---|
| ICXA-400-010Navigating the Industry Applications Body of KnowledgeReading reference | NavigationPDF | Cross-sector |
| ICXA-401-010Applying the ICxA Standards to PowerReading reference | GuidePDF | Power |
| ICXA-401-020Power Terminology and Milestone CrosswalkReading reference | ReferencePDF | Power |
| ICXA-401-030Roles, Contracting Models and Division of Responsibility in PowerReading reference | GuidePDF | Power |
| ICXA-401-040Power Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Power |
| ICXA-401-110Defining Outcomes and Outcome Requirements for PowerReading reference | GuidePDF | Power |
| ICXA-401-120Outcome Evidence Need: Worked Examples for PowerReading reference | GuidePDF | Power |
| ICXA-401-130Completion, Performance and Acceptance Tests in PowerReading reference | GuidePDF | Power |
| ICXA-401-140Lender, Insurer and Offtaker Evidence Interfaces in PowerReading reference | GuidePDF | Power |
| ICXA-401-150Outcome Risk and Residual Risk Library for PowerWorking resource | ToolXLSX | Power |
| ICXA-401-160Grid Interconnection and Offtake Milestones as Outcome Stage-GatesReading reference | GuidePDF | Power |
| ICXA-401-210Reference System Breakdown Structure for PowerWorking resource | ToolXLSX | Power |
| ICXA-401-220Power Commissioning Plan - TemplateWorking resource | TemplateDOCX | Power |
| ICXA-401-230Power Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Power |
| ICXA-401-240Deficiency Classification: Worked Examples for PowerReading reference | GuidePDF | Power |
| ICXA-401-250Energization Readiness for Power FacilitiesReading reference | Industry ApplicationPDF | Power |
| ICXA-401-255Initial Synchronization and First Power: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Power |
| ICXA-401-260Grid-Code Compliance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Power |
| ICXA-401-265Reliability Run: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Power |
| ICXA-401-270Performance and Capacity Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Power |
| ICXA-401-275Commercial Operation Readiness: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Power |
| ICXA-401-300Commissioning Electrical SubstationsReading reference | Industry ApplicationPDF | Power |
| ICXA-401-305Commissioning Power Transmission and Distribution NetworksReading reference | Industry ApplicationPDF | Power |
| ICXA-401-310Commissioning Protection, Control and SCADA: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-315Commissioning Power Transformers and Reactors: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-320Commissioning HVDC Converter Stations: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-325Commissioning STATCOM, Synchronous Condensers and Reactive Compensation: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-330Commissioning Hydroelectric Power FacilitiesReading reference | Industry ApplicationPDF | Power |
| ICXA-401-335Commissioning Thermal Power FacilitiesReading reference | Industry ApplicationPDF | Power |
| ICXA-401-340Commissioning Steam Cycle and Balance of Plant: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-345Commissioning Utility-Scale Solar Photovoltaic FacilitiesReading reference | Industry ApplicationPDF | Power |
| ICXA-401-350Commissioning Wind Power FacilitiesReading reference | Industry ApplicationPDF | Power |
| ICXA-401-355Commissioning Offshore Wind (Turbines, Array Cables, Offshore Substation): System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-360Commissioning Battery Energy Storage SystemsReading reference | Industry ApplicationPDF | Power |
| ICXA-401-365Commissioning Grid Interconnection and Revenue Metering: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-370Commissioning Distribution Networks: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-375Commissioning Black Start and Station Auxiliary Power: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Power |
| ICXA-401-400Substations (Air- and Gas-Insulated): Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-405Transmission Lines and Cables: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-410Protection, Control and SCADA: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-415Power Transformers and Reactors: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-420HVDC Converter Stations: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-425STATCOM, Synchronous Condensers and Reactive Compensation: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-430Hydroelectric Units: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-435Gas Turbine and Combined-Cycle Plant: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-440Steam Cycle and Balance of Plant: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-445Utility-Scale Solar PV: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-450Onshore Wind: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-455Offshore Wind (Turbines, Array Cables, Offshore Substation): Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-460Battery Energy Storage Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-465Grid Interconnection and Revenue Metering: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-470Distribution Networks: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-475Black Start and Station Auxiliary Power: Checklists and Test RecordsWorking resource | Checklist setDOCX | Power |
| ICXA-401-510Power Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Power |
| ICXA-401-520Power Issues and Deficiency LogWorking resource | ToolXLSX | Power |
| ICXA-401-530Power Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Power |
| ICXA-401-540Power Certificates and Release Records SetWorking resource | TemplateDOCX | Power |
| ICXA-401-550Power Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Power |
| ICXA-401-560Energization and Switching Programme - TemplateWorking resource | TemplateDOCX | Power |
| ICXA-401-610Operational Readiness for PowerReading reference | GuidePDF | Power |
| ICXA-401-620Readiness Criteria Library for PowerWorking resource | ToolXLSX | Power |
| ICXA-401-630Staffing, Training and Competence for Power OperationsReading reference | GuidePDF | Power |
| ICXA-401-640Operating Procedures Set for PowerWorking resource | TemplateDOCX | Power |
| ICXA-401-650Maintenance, Spares and Asset Data Readiness for PowerReading reference | GuidePDF | Power |
| ICXA-401-660Ramp-Up and Stabilization in PowerReading reference | GuidePDF | Power |
| ICXA-401-710Power Handover Dossier IndexWorking resource | ToolXLSX | Power |
| ICXA-401-720Power Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Power |
| ICXA-401-810Standards, Codes and Regulatory Map for PowerReading reference | ReferencePDF | Power |
| ICXA-401-910Worked Example: A Power Project End to EndReading reference | Worked examplePDF | Power |
| ICXA-402-010Applying the ICxA Standards to Oil & GasReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-020Oil & Gas Terminology and Milestone CrosswalkReading reference | ReferencePDF | Oil & Gas |
| ICXA-402-030Roles, Contracting Models and Division of Responsibility in Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-040Oil & Gas Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Oil & Gas |
| ICXA-402-110Defining Outcomes and Outcome Requirements for Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-120Outcome Evidence Need: Worked Examples for Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-130Completion, Performance and Acceptance Tests in Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-140Lender, Insurer and Offtaker Evidence Interfaces in Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-150Outcome Risk and Residual Risk Library for Oil & GasWorking resource | ToolXLSX | Oil & Gas |
| ICXA-402-210Reference System Breakdown Structure for Oil & GasWorking resource | ToolXLSX | Oil & Gas |
| ICXA-402-220Oil & Gas Commissioning Plan - TemplateWorking resource | TemplateDOCX | Oil & Gas |
| ICXA-402-230Oil & Gas Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Oil & Gas |
| ICXA-402-240Deficiency Classification: Worked Examples for Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-250Mechanical Completion: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Oil & Gas |
| ICXA-402-255Pre-Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Oil & Gas |
| ICXA-402-260Commissioning to Ready for Start-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Oil & Gas |
| ICXA-402-265Start-Up and First Hydrocarbons: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Oil & Gas |
| ICXA-402-270Performance Test Run: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Oil & Gas |
| ICXA-402-275Handover to Operations: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Oil & Gas |
| ICXA-402-300Commissioning Onshore Production and Gathering FacilitiesReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-305Commissioning Onshore Gas Processing and Compression FacilitiesReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-310Commissioning LNG FacilitiesReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-315Commissioning Refinery and Petrochemical Process UnitsReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-320Commissioning Oil and Gas Pipeline SystemsReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-325Commissioning Hydrocarbon Storage and Loading FacilitiesReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-330Commissioning Hydrocarbon Measurement and Allocation SystemsReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-335Commissioning Offshore Production and Subsea Tie-Back SystemsReading reference | Industry ApplicationPDF | Oil & Gas |
| ICXA-402-340Commissioning Subsea Tie-Backs: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Oil & Gas |
| ICXA-402-345Commissioning Flare, Relief and Blowdown: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Oil & Gas |
| ICXA-402-350Commissioning Utilities (Instrument Air, Nitrogen, Power, Water): System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Oil & Gas |
| ICXA-402-355Commissioning Integrated Control, Emergency Shutdown and Fire and Gas Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Oil & Gas |
| ICXA-402-360Commissioning Compressors, Turbines and Pumps: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Oil & Gas |
| ICXA-402-365Commissioning Fired Heaters and Boilers: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Oil & Gas |
| ICXA-402-400Onshore Production and Gathering: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-405Gas Processing and Compression: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-410LNG Liquefaction and Regasification: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-415Refinery and Petrochemical Units: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-420Pipelines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-425Storage and Loading: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-430Measurement and Allocation: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-435Offshore Topsides: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-440Subsea Tie-Backs: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-445Flare, Relief and Blowdown: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-450Utilities (Instrument Air, Nitrogen, Power, Water): Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-455Integrated Control, Emergency Shutdown and Fire and Gas Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-460Compressors, Turbines and Pumps: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-465Fired Heaters and Boilers: Checklists and Test RecordsWorking resource | Checklist setDOCX | Oil & Gas |
| ICXA-402-510Oil & Gas Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Oil & Gas |
| ICXA-402-520Oil & Gas Issues and Deficiency LogWorking resource | ToolXLSX | Oil & Gas |
| ICXA-402-530Oil & Gas Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Oil & Gas |
| ICXA-402-540Oil & Gas Certificates and Release Records SetWorking resource | TemplateDOCX | Oil & Gas |
| ICXA-402-550Oil & Gas Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Oil & Gas |
| ICXA-402-610Operational Readiness for Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-620Readiness Criteria Library for Oil & GasWorking resource | ToolXLSX | Oil & Gas |
| ICXA-402-630Staffing, Training and Competence for Oil & Gas OperationsReading reference | GuidePDF | Oil & Gas |
| ICXA-402-640Operating Procedures Set for Oil & GasWorking resource | TemplateDOCX | Oil & Gas |
| ICXA-402-650Maintenance, Spares and Asset Data Readiness for Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-660Ramp-Up and Stabilization in Oil & GasReading reference | GuidePDF | Oil & Gas |
| ICXA-402-710Oil & Gas Handover Dossier IndexWorking resource | ToolXLSX | Oil & Gas |
| ICXA-402-720Oil & Gas Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Oil & Gas |
| ICXA-402-810Standards, Codes and Regulatory Map for Oil & GasReading reference | ReferencePDF | Oil & Gas |
| ICXA-402-910Worked Example: A Oil & Gas Project End to EndReading reference | Worked examplePDF | Oil & Gas |
| ICXA-403-010Applying the ICxA Standards to MiningReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-020Mining Terminology and Milestone CrosswalkReading reference | ReferencePDF | Mining |
| ICXA-403-030Roles, Contracting Models and Division of Responsibility in MiningReading reference | GuidePDF | Mining |
| ICXA-403-040Mining Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Mining |
| ICXA-403-110Defining Outcomes and Outcome Requirements for MiningReading reference | GuidePDF | Mining |
| ICXA-403-120Outcome Evidence Need: Worked Examples for MiningReading reference | GuidePDF | Mining |
| ICXA-403-130Completion, Performance and Acceptance Tests in MiningReading reference | GuidePDF | Mining |
| ICXA-403-140Lender, Insurer and Offtaker Evidence Interfaces in MiningReading reference | GuidePDF | Mining |
| ICXA-403-150Outcome Risk and Residual Risk Library for MiningWorking resource | ToolXLSX | Mining |
| ICXA-403-210Reference System Breakdown Structure for MiningWorking resource | ToolXLSX | Mining |
| ICXA-403-220Mining Commissioning Plan - TemplateWorking resource | TemplateDOCX | Mining |
| ICXA-403-230Mining Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Mining |
| ICXA-403-240Deficiency Classification: Worked Examples for MiningReading reference | GuidePDF | Mining |
| ICXA-403-250C1 Construction Verification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Mining |
| ICXA-403-255C2 Dry Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Mining |
| ICXA-403-260C3 Wet Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Mining |
| ICXA-403-265C4 Ore (Process) Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Mining |
| ICXA-403-270C5 Ramp-Up and Performance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Mining |
| ICXA-403-275Operational Handover: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Mining |
| ICXA-403-300Commissioning Crushing and Grinding: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Mining |
| ICXA-403-305Commissioning Mineral Processing and Concentrator PlantsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-310Commissioning Thickening and Filtration: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Mining |
| ICXA-403-315Commissioning Reagents: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Mining |
| ICXA-403-320Commissioning Bulk-Materials Handling and Conveyor SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-325Commissioning Tailings Management FacilitiesReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-330Commissioning Mine Dewatering and Drainage SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-335Commissioning Site Water Management: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Mining |
| ICXA-403-340Commissioning Mine Electrical Power and Electrification SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-345Commissioning Mine Shaft and Hoisting SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-350Commissioning Underground Mine Infrastructure and VentilationReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-355Commissioning Mine Backfill Plant and Distribution SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-360Commissioning Open-Pit Mine Mobile Fleet and Haul-Road SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-365Commissioning Mine Automation, Autonomous Equipment and Remote Operations SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-370Commissioning Mine Communications, Tracking and Emergency Alert SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-375Commissioning Mine Fuel, Lubricant and Refuelling SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-380Commissioning Mine Explosives and Blasting-Support SystemsReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-385Commissioning Mine Maintenance and Workshop FacilitiesReading reference | Industry ApplicationPDF | Mining |
| ICXA-403-400Crushing and Grinding: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-405Flotation, Leaching and Concentrator Circuits: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-410Thickening and Filtration: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-415Reagents: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-420Bulk Materials Handling and Conveyors: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-425Tailings Management Facilities: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-430Dewatering and Drainage: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-435Site Water Management: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-440Mine Power and Electrification: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-445Shaft and Hoisting: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-450Underground Infrastructure and Ventilation: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-455Backfill Plant and Distribution: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-460Mobile Fleet and Haul Roads: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-465Automation, Autonomous Equipment and Remote Operations: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-470Communications, Tracking and Emergency Alert: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-475Fuel, Lubricant and Refuelling: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-480Explosives and Blasting Support: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-485Maintenance and Workshop Facilities: Checklists and Test RecordsWorking resource | Checklist setDOCX | Mining |
| ICXA-403-510Mining Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Mining |
| ICXA-403-520Mining Issues and Deficiency LogWorking resource | ToolXLSX | Mining |
| ICXA-403-530Mining Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Mining |
| ICXA-403-540Mining Certificates and Release Records SetWorking resource | TemplateDOCX | Mining |
| ICXA-403-550Mining Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Mining |
| ICXA-403-610Operational Readiness for MiningReading reference | GuidePDF | Mining |
| ICXA-403-620Readiness Criteria Library for MiningWorking resource | ToolXLSX | Mining |
| ICXA-403-630Staffing, Training and Competence for Mining OperationsReading reference | GuidePDF | Mining |
| ICXA-403-640Operating Procedures Set for MiningWorking resource | TemplateDOCX | Mining |
| ICXA-403-650Maintenance, Spares and Asset Data Readiness for MiningReading reference | GuidePDF | Mining |
| ICXA-403-660Ramp-Up and Stabilization in MiningReading reference | GuidePDF | Mining |
| ICXA-403-710Mining Handover Dossier IndexWorking resource | ToolXLSX | Mining |
| ICXA-403-720Mining Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Mining |
| ICXA-403-810Standards, Codes and Regulatory Map for MiningReading reference | ReferencePDF | Mining |
| ICXA-403-910Worked Example: A Mining Project End to EndReading reference | Worked examplePDF | Mining |
| ICXA-404-010Applying the ICxA Standards to Water-WastewaterReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-020Water-Wastewater Terminology and Milestone CrosswalkReading reference | ReferencePDF | Water-Wastewater |
| ICXA-404-030Roles, Contracting Models and Division of Responsibility in Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-040Water-Wastewater Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Water-Wastewater |
| ICXA-404-110Defining Outcomes and Outcome Requirements for Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-120Outcome Evidence Need: Worked Examples for Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-130Completion, Performance and Acceptance Tests in Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-140Lender, Insurer and Offtaker Evidence Interfaces in Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-150Outcome Risk and Residual Risk Library for Water-WastewaterWorking resource | ToolXLSX | Water-Wastewater |
| ICXA-404-210Reference System Breakdown Structure for Water-WastewaterWorking resource | ToolXLSX | Water-Wastewater |
| ICXA-404-220Water-Wastewater Commissioning Plan - TemplateWorking resource | TemplateDOCX | Water-Wastewater |
| ICXA-404-230Water-Wastewater Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Water-Wastewater |
| ICXA-404-240Deficiency Classification: Worked Examples for Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-250Construction Completion and Pre-Functional Checks: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Water-Wastewater |
| ICXA-404-255Clean-Water and Functional Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Water-Wastewater |
| ICXA-404-260Process Commissioning and Seeding: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Water-Wastewater |
| ICXA-404-265Process Proving and Performance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Water-Wastewater |
| ICXA-404-270Operational Demonstration Period: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Water-Wastewater |
| ICXA-404-275Regulatory Acceptance and Takeover: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Water-Wastewater |
| ICXA-404-300Commissioning Conventional Drinking-Water Treatment SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-305Commissioning Membrane Water Treatment SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-310Commissioning Desalination: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Water-Wastewater |
| ICXA-404-315Commissioning Disinfection and Chemical Dosing SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-320Commissioning Water and Wastewater Pumping StationsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-325Commissioning Water Storage and Distribution SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-330Commissioning Wastewater Collection SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-335Commissioning Preliminary and Primary Treatment: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Water-Wastewater |
| ICXA-404-340Commissioning Biological Wastewater Treatment SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-345Commissioning Tertiary Wastewater Treatment and Water Reuse SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-350Commissioning Sludge Treatment and Biosolids Handling SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-355Commissioning Anaerobic Digestion and Biogas SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-360Commissioning Stormwater Management SystemsReading reference | Industry ApplicationPDF | Water-Wastewater |
| ICXA-404-365Commissioning Odour Control: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Water-Wastewater |
| ICXA-404-370Commissioning SCADA and Telemetry: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Water-Wastewater |
| ICXA-404-400Conventional Drinking-Water Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-405Membrane Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-410Desalination: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-415Disinfection and Chemical Dosing: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-420Pumping Stations: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-425Storage and Distribution: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-430Wastewater Collection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-435Preliminary and Primary Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-440Biological Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-445Tertiary Treatment and Reuse: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-450Sludge and Biosolids: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-455Anaerobic Digestion and Biogas: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-460Stormwater: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-465Odour Control: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-470SCADA and Telemetry: Checklists and Test RecordsWorking resource | Checklist setDOCX | Water-Wastewater |
| ICXA-404-510Water-Wastewater Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Water-Wastewater |
| ICXA-404-520Water-Wastewater Issues and Deficiency LogWorking resource | ToolXLSX | Water-Wastewater |
| ICXA-404-530Water-Wastewater Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Water-Wastewater |
| ICXA-404-540Water-Wastewater Certificates and Release Records SetWorking resource | TemplateDOCX | Water-Wastewater |
| ICXA-404-550Water-Wastewater Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Water-Wastewater |
| ICXA-404-610Operational Readiness for Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-620Readiness Criteria Library for Water-WastewaterWorking resource | ToolXLSX | Water-Wastewater |
| ICXA-404-630Staffing, Training and Competence for Water-Wastewater OperationsReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-640Operating Procedures Set for Water-WastewaterWorking resource | TemplateDOCX | Water-Wastewater |
| ICXA-404-650Maintenance, Spares and Asset Data Readiness for Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-660Ramp-Up and Stabilization in Water-WastewaterReading reference | GuidePDF | Water-Wastewater |
| ICXA-404-710Water-Wastewater Handover Dossier IndexWorking resource | ToolXLSX | Water-Wastewater |
| ICXA-404-720Water-Wastewater Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Water-Wastewater |
| ICXA-404-810Standards, Codes and Regulatory Map for Water-WastewaterReading reference | ReferencePDF | Water-Wastewater |
| ICXA-404-910Worked Example: A Water-Wastewater Project End to EndReading reference | Worked examplePDF | Water-Wastewater |
| ICXA-405-010Applying the ICxA Standards to TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-020Transportation Terminology and Milestone CrosswalkReading reference | ReferencePDF | Transportation |
| ICXA-405-030Roles, Contracting Models and Division of Responsibility in TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-040Transportation Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Transportation |
| ICXA-405-110Defining Outcomes and Outcome Requirements for TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-120Outcome Evidence Need: Worked Examples for TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-130Completion, Performance and Acceptance Tests in TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-140Lender, Insurer and Offtaker Evidence Interfaces in TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-150Outcome Risk and Residual Risk Library for TransportationWorking resource | ToolXLSX | Transportation |
| ICXA-405-210Reference System Breakdown Structure for TransportationWorking resource | ToolXLSX | Transportation |
| ICXA-405-220Transportation Commissioning Plan - TemplateWorking resource | TemplateDOCX | Transportation |
| ICXA-405-230Transportation Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Transportation |
| ICXA-405-240Deficiency Classification: Worked Examples for TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-250Factory and Site Acceptance: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Transportation |
| ICXA-405-255Static and Subsystem Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Transportation |
| ICXA-405-260Systems Integration Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Transportation |
| ICXA-405-265Dynamic Testing and Trial Running: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Transportation |
| ICXA-405-270Trial and Shadow Operations: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Transportation |
| ICXA-405-275Safety Certification and Revenue-Service Readiness: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Transportation |
| ICXA-405-300Integrated Rail-System CommissioningReading reference | Industry ApplicationPDF | Transportation |
| ICXA-405-305Commissioning Signalling and Train Control: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Transportation |
| ICXA-405-310Commissioning Traction Power and Overhead Contact Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Transportation |
| ICXA-405-315Commissioning Rolling Stock: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Transportation |
| ICXA-405-320Commissioning Stations and Platform Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Transportation |
| ICXA-405-325Commissioning Depots and Control Centres: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Transportation |
| ICXA-405-330Commissioning Tunnel Ventilation and Fire-Life-Safety: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Transportation |
| ICXA-405-335Commissioning Road TunnelsReading reference | Industry ApplicationPDF | Transportation |
| ICXA-405-340Commissioning Highway and Intelligent Transportation SystemsReading reference | Industry ApplicationPDF | Transportation |
| ICXA-405-345Commissioning Movable Bridge SystemsReading reference | Industry ApplicationPDF | Transportation |
| ICXA-405-350Commissioning Airport FacilitiesReading reference | Industry ApplicationPDF | Transportation |
| ICXA-405-355Commissioning Port and Marine Terminal FacilitiesReading reference | Industry ApplicationPDF | Transportation |
| ICXA-405-360Commissioning Tolling and Fare Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Transportation |
| ICXA-405-400Rail Systems Integration: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-405Signalling and Train Control: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-410Traction Power and Overhead Contact Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-415Rolling Stock: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-420Stations and Platform Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-425Depots and Control Centres: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-430Tunnel Ventilation and Fire-Life-Safety: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-435Road Tunnels: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-440Highways and Intelligent Transportation Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-445Movable Bridges: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-450Airport Terminals, Baggage and Airfield Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-455Ports and Marine Terminals: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-460Tolling and Fare Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Transportation |
| ICXA-405-510Transportation Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Transportation |
| ICXA-405-520Transportation Issues and Deficiency LogWorking resource | ToolXLSX | Transportation |
| ICXA-405-530Transportation Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Transportation |
| ICXA-405-540Transportation Certificates and Release Records SetWorking resource | TemplateDOCX | Transportation |
| ICXA-405-550Transportation Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Transportation |
| ICXA-405-610Operational Readiness for TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-620Readiness Criteria Library for TransportationWorking resource | ToolXLSX | Transportation |
| ICXA-405-630Staffing, Training and Competence for Transportation OperationsReading reference | GuidePDF | Transportation |
| ICXA-405-640Operating Procedures Set for TransportationWorking resource | TemplateDOCX | Transportation |
| ICXA-405-650Maintenance, Spares and Asset Data Readiness for TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-660Ramp-Up and Stabilization in TransportationReading reference | GuidePDF | Transportation |
| ICXA-405-670Operational Readiness and Airport Transfer (ORAT) ProgrammeReading reference | GuidePDF | Transportation |
| ICXA-405-680Rail Activation and Entry into Revenue ServiceReading reference | GuidePDF | Transportation |
| ICXA-405-710Transportation Handover Dossier IndexWorking resource | ToolXLSX | Transportation |
| ICXA-405-720Transportation Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Transportation |
| ICXA-405-810Standards, Codes and Regulatory Map for TransportationReading reference | ReferencePDF | Transportation |
| ICXA-405-910Worked Example: A Transportation Project End to EndReading reference | Worked examplePDF | Transportation |
| ICXA-406-010Applying the ICxA Standards to Data CentersReading reference | Industry ApplicationPDF | Data Centers |
| ICXA-406-020Data Centers Terminology and Milestone CrosswalkReading reference | ReferencePDF | Data Centers |
| ICXA-406-030Roles, Contracting Models and Division of Responsibility in Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-040Data Centers Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Data Centers |
| ICXA-406-110Defining Outcomes and Outcome Requirements for Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-120Outcome Evidence Need: Worked Examples for Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-130Completion, Performance and Acceptance Tests in Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-140Lender, Insurer and Offtaker Evidence Interfaces in Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-150Outcome Risk and Residual Risk Library for Data CentersWorking resource | ToolXLSX | Data Centers |
| ICXA-406-160Evidence for Availability, Capacity, Efficiency and Maintainability ClaimsReading reference | GuidePDF | Data Centers |
| ICXA-406-210Reference System Breakdown Structure for Data CentersWorking resource | ToolXLSX | Data Centers |
| ICXA-406-220Data Centers Commissioning Plan - TemplateWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-230Data Centers Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Data Centers |
| ICXA-406-240Deficiency Classification: Worked Examples for Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-250Level 1 (L1) Factory Witness Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Data Centers |
| ICXA-406-255Level 2 (L2) Delivery, Installation and Site Acceptance Verification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Data Centers |
| ICXA-406-260Level 3 (L3) Pre-Functional Checks and Equipment Start-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Data Centers |
| ICXA-406-265Level 4 (L4) Functional Performance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Data Centers |
| ICXA-406-270Level 5 (L5) Integrated Systems Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Data Centers |
| ICXA-406-275Turnover, Deferred and Seasonal Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Data Centers |
| ICXA-406-300Commissioning Data Center Critical Power SystemsReading reference | Industry ApplicationPDF | Data Centers |
| ICXA-406-305Commissioning Utility Intake and Medium-Voltage Switchgear: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-310Commissioning Low-Voltage Switchgear and Switchboards: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-315Commissioning Generators, Paralleling and Fuel Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-320Commissioning UPS and Battery Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-325Commissioning Static and Automatic Transfer Switches: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-330Commissioning Power Distribution Units, Remote Power Panels and Busway: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-335Commissioning Data Center Cooling and Environmental Control SystemsReading reference | Industry ApplicationPDF | Data Centers |
| ICXA-406-340Commissioning Computer Room Air Handling and Fan Walls: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-345Commissioning Liquid-Cooled Data Center InfrastructureReading reference | Industry ApplicationPDF | Data Centers |
| ICXA-406-350Commissioning Building Management and Electrical Power Monitoring Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-355Commissioning Data Center Fire Detection and Suppression SystemsReading reference | Industry ApplicationPDF | Data Centers |
| ICXA-406-360Commissioning Leak Detection: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-365Commissioning Grounding, Bonding and Lightning Protection: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-370Commissioning Security and Access Control: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-375Commissioning Structured Cabling and Network Rooms: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Data Centers |
| ICXA-406-400Critical Power Path (End to End): Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-405Utility Intake and Medium-Voltage Switchgear: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-410Low-Voltage Switchgear and Switchboards: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-415Generators, Paralleling and Fuel Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-420UPS and Battery Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-425Static and Automatic Transfer Switches: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-430Power Distribution Units, Remote Power Panels and Busway: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-435Chilled Water Plant and Heat Rejection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-440Computer Room Air Handling and Fan Walls: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-445Liquid Cooling (Coolant Distribution Units and Technology Cooling System): Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-450Building Management and Electrical Power Monitoring Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-455Fire Detection and Suppression: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-460Leak Detection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-465Grounding, Bonding and Lightning Protection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-470Security and Access Control: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-475Structured Cabling and Network Rooms: Checklists and Test RecordsWorking resource | Checklist setDOCX | Data Centers |
| ICXA-406-510Data Centers Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-520Data Centers Issues and Deficiency LogWorking resource | ToolXLSX | Data Centers |
| ICXA-406-530Data Centers Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-540Data Centers Certificates and Release Records SetWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-550Data Centers Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Data Centers |
| ICXA-406-560Owner Project Requirements and Basis of Design Mapping to Outcome RequirementsWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-570Systems Manual - TemplateWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-580Load Bank PlanWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-585Integrated Systems Test Failure-Scenario MatrixWorking resource | ToolXLSX | Data Centers |
| ICXA-406-590Phased Hall and Capacity Release RecordWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-610Operational Readiness for Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-620Readiness Criteria Library for Data CentersWorking resource | ToolXLSX | Data Centers |
| ICXA-406-630Staffing, Training and Competence for Data Centers OperationsReading reference | GuidePDF | Data Centers |
| ICXA-406-640Operating Procedures Set for Data CentersWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-650Maintenance, Spares and Asset Data Readiness for Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-660Ramp-Up and Stabilization in Data CentersReading reference | GuidePDF | Data Centers |
| ICXA-406-670Standard, Maintenance and Emergency Operating Procedure Templates (SOP, MOP, EOP)Working resource | TemplateDOCX | Data Centers |
| ICXA-406-680Colocation Tenant Fit-Out and Customer HandoverReading reference | GuidePDF | Data Centers |
| ICXA-406-690Change Management and Critical Environment Work RulesReading reference | GuidePDF | Data Centers |
| ICXA-406-710Data Centers Handover Dossier IndexWorking resource | ToolXLSX | Data Centers |
| ICXA-406-720Data Centers Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Data Centers |
| ICXA-406-810Standards, Codes and Regulatory Map for Data CentersReading reference | ReferencePDF | Data Centers |
| ICXA-406-910Worked Example: A Data Centers Project End to EndReading reference | Worked examplePDF | Data Centers |
| ICXA-407-010Applying the ICxA Standards to Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-020Buildings & Healthcare Terminology and Milestone CrosswalkReading reference | ReferencePDF | Buildings & Healthcare |
| ICXA-407-030Roles, Contracting Models and Division of Responsibility in Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-040Buildings & Healthcare Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Buildings & Healthcare |
| ICXA-407-110Defining Outcomes and Outcome Requirements for Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-120Outcome Evidence Need: Worked Examples for Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-130Completion, Performance and Acceptance Tests in Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-140Lender, Insurer and Offtaker Evidence Interfaces in Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-150Outcome Risk and Residual Risk Library for Buildings & HealthcareWorking resource | ToolXLSX | Buildings & Healthcare |
| ICXA-407-210Reference System Breakdown Structure for Buildings & HealthcareWorking resource | ToolXLSX | Buildings & Healthcare |
| ICXA-407-220Buildings & Healthcare Commissioning Plan - TemplateWorking resource | TemplateDOCX | Buildings & Healthcare |
| ICXA-407-230Buildings & Healthcare Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Buildings & Healthcare |
| ICXA-407-240Deficiency Classification: Worked Examples for Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-250Design-Phase Commissioning (Owner Requirements and Basis of Design Review): Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Buildings & Healthcare |
| ICXA-407-255Pre-Functional Checklists: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Buildings & Healthcare |
| ICXA-407-260Functional Performance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Buildings & Healthcare |
| ICXA-407-265Integrated and Life-Safety Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Buildings & Healthcare |
| ICXA-407-270Occupancy, Seasonal and Deferred Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Buildings & Healthcare |
| ICXA-407-275Clinical and Operational Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Buildings & Healthcare |
| ICXA-407-300Commissioning HVAC Air and Hydronic Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-305Commissioning Building Automation: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-310Commissioning Electrical Distribution and Emergency Power: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-315Commissioning Lighting and Lighting Controls: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-320Commissioning Plumbing and Domestic Water: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-325Commissioning Fire Alarm and Life Safety: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-330Commissioning Smoke Control: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-335Commissioning Building Enclosure: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-340Commissioning Medical Gas and Vacuum: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-345Commissioning Operating Rooms, Isolation Rooms and Critical Environments: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-350Commissioning Laboratories: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-355Commissioning Vertical Transportation: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-360Commissioning Security, Nurse Call and ICT: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Buildings & Healthcare |
| ICXA-407-400HVAC Air and Hydronic Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-405Building Automation: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-410Electrical Distribution and Emergency Power: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-415Lighting and Lighting Controls: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-420Plumbing and Domestic Water: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-425Fire Alarm and Life Safety: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-430Smoke Control: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-435Building Enclosure: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-440Medical Gas and Vacuum: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-445Operating Rooms, Isolation Rooms and Critical Environments: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-450Laboratories: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-455Vertical Transportation: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-460Security, Nurse Call and ICT: Checklists and Test RecordsWorking resource | Checklist setDOCX | Buildings & Healthcare |
| ICXA-407-510Buildings & Healthcare Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Buildings & Healthcare |
| ICXA-407-520Buildings & Healthcare Issues and Deficiency LogWorking resource | ToolXLSX | Buildings & Healthcare |
| ICXA-407-530Buildings & Healthcare Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Buildings & Healthcare |
| ICXA-407-540Buildings & Healthcare Certificates and Release Records SetWorking resource | TemplateDOCX | Buildings & Healthcare |
| ICXA-407-550Buildings & Healthcare Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Buildings & Healthcare |
| ICXA-407-610Operational Readiness for Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-620Readiness Criteria Library for Buildings & HealthcareWorking resource | ToolXLSX | Buildings & Healthcare |
| ICXA-407-630Staffing, Training and Competence for Buildings & Healthcare OperationsReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-640Operating Procedures Set for Buildings & HealthcareWorking resource | TemplateDOCX | Buildings & Healthcare |
| ICXA-407-650Maintenance, Spares and Asset Data Readiness for Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-660Ramp-Up and Stabilization in Buildings & HealthcareReading reference | GuidePDF | Buildings & Healthcare |
| ICXA-407-710Buildings & Healthcare Handover Dossier IndexWorking resource | ToolXLSX | Buildings & Healthcare |
| ICXA-407-720Buildings & Healthcare Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Buildings & Healthcare |
| ICXA-407-810Standards, Codes and Regulatory Map for Buildings & HealthcareReading reference | ReferencePDF | Buildings & Healthcare |
| ICXA-407-910Worked Example: A Buildings & Healthcare Project End to EndReading reference | Worked examplePDF | Buildings & Healthcare |
| ICXA-408-010Applying the ICxA Standards to Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-020Life Sciences Terminology and Milestone CrosswalkReading reference | ReferencePDF | Life Sciences |
| ICXA-408-030Roles, Contracting Models and Division of Responsibility in Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-040Life Sciences Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Life Sciences |
| ICXA-408-110Defining Outcomes and Outcome Requirements for Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-120Outcome Evidence Need: Worked Examples for Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-130Completion, Performance and Acceptance Tests in Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-140Lender, Insurer and Offtaker Evidence Interfaces in Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-150Outcome Risk and Residual Risk Library for Life SciencesWorking resource | ToolXLSX | Life Sciences |
| ICXA-408-160Aligning Commissioning and Qualification with Outcome Evidence NeedReading reference | GuidePDF | Life Sciences |
| ICXA-408-210Reference System Breakdown Structure for Life SciencesWorking resource | ToolXLSX | Life Sciences |
| ICXA-408-220Life Sciences Commissioning Plan - TemplateWorking resource | TemplateDOCX | Life Sciences |
| ICXA-408-230Life Sciences Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Life Sciences |
| ICXA-408-240Deficiency Classification: Worked Examples for Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-250Design Qualification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Life Sciences |
| ICXA-408-255Factory and Site Acceptance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Life Sciences |
| ICXA-408-260Commissioning and Its Integration with Qualification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Life Sciences |
| ICXA-408-265Installation Qualification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Life Sciences |
| ICXA-408-270Operational Qualification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Life Sciences |
| ICXA-408-275Performance Qualification and Handover to Process Validation: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Life Sciences |
| ICXA-408-300Commissioning Purified Water and Water for Injection: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-305Commissioning Clean Steam: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-310Commissioning Cleanroom HVAC and Environmental Monitoring: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-315Commissioning Process Equipment and Skids: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-320Commissioning Clean-in-Place and Steam-in-Place: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-325Commissioning Automation and Computerized Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-330Commissioning Process Gases: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-335Commissioning Fill-Finish and Isolators: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-340Commissioning Cold Storage and Cold Chain: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-345Commissioning Waste Decontamination: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Life Sciences |
| ICXA-408-400Purified Water and Water for Injection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-405Clean Steam: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-410Cleanroom HVAC and Environmental Monitoring: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-415Process Equipment and Skids: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-420Clean-in-Place and Steam-in-Place: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-425Automation and Computerized Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-430Process Gases: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-435Fill-Finish and Isolators: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-440Cold Storage and Cold Chain: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-445Waste Decontamination: Checklists and Test RecordsWorking resource | Checklist setDOCX | Life Sciences |
| ICXA-408-510Life Sciences Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Life Sciences |
| ICXA-408-520Life Sciences Issues and Deficiency LogWorking resource | ToolXLSX | Life Sciences |
| ICXA-408-530Life Sciences Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Life Sciences |
| ICXA-408-540Life Sciences Certificates and Release Records SetWorking resource | TemplateDOCX | Life Sciences |
| ICXA-408-550Life Sciences Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Life Sciences |
| ICXA-408-610Operational Readiness for Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-620Readiness Criteria Library for Life SciencesWorking resource | ToolXLSX | Life Sciences |
| ICXA-408-630Staffing, Training and Competence for Life Sciences OperationsReading reference | GuidePDF | Life Sciences |
| ICXA-408-640Operating Procedures Set for Life SciencesWorking resource | TemplateDOCX | Life Sciences |
| ICXA-408-650Maintenance, Spares and Asset Data Readiness for Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-660Ramp-Up and Stabilization in Life SciencesReading reference | GuidePDF | Life Sciences |
| ICXA-408-710Life Sciences Handover Dossier IndexWorking resource | ToolXLSX | Life Sciences |
| ICXA-408-720Life Sciences Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Life Sciences |
| ICXA-408-810Standards, Codes and Regulatory Map for Life SciencesReading reference | ReferencePDF | Life Sciences |
| ICXA-408-910Worked Example: A Life Sciences Project End to EndReading reference | Worked examplePDF | Life Sciences |
| ICXA-409-010Applying the ICxA Standards to Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-020Hydrogen & Low-Carbon Fuels Terminology and Milestone CrosswalkReading reference | ReferencePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-030Roles, Contracting Models and Division of Responsibility in Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-040Hydrogen & Low-Carbon Fuels Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-110Defining Outcomes and Outcome Requirements for Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-120Outcome Evidence Need: Worked Examples for Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-130Completion, Performance and Acceptance Tests in Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-140Lender, Insurer and Offtaker Evidence Interfaces in Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-150Outcome Risk and Residual Risk Library for Hydrogen & Low-Carbon FuelsWorking resource | ToolXLSX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-210Reference System Breakdown Structure for Hydrogen & Low-Carbon FuelsWorking resource | ToolXLSX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-220Hydrogen & Low-Carbon Fuels Commissioning Plan - TemplateWorking resource | TemplateDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-230Hydrogen & Low-Carbon Fuels Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-240Deficiency Classification: Worked Examples for Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-250Mechanical Completion: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-255Pre-Commissioning and Inerting: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-260Commissioning to Ready for Start-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-265First Hydrogen and Start-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-270Performance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-275Handover to Operations: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-300Commissioning Electrolyser Stacks and Balance of Plant: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-305Commissioning Power Supply and Rectifiers: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-310Commissioning Feed Water Treatment: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-315Commissioning Hydrogen Compression: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-320Commissioning Hydrogen Storage: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-325Commissioning Purification and Drying: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-330Commissioning Ammonia Synthesis Loop: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-335Commissioning Ammonia Storage and Loading: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-340Commissioning Carbon Capture Units: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-345Commissioning Carbon Dioxide Compression and Transport: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-350Commissioning Hydrogen Refuelling Stations: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-355Commissioning Gas Detection, Ventilation and Emergency Shutdown: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-400Electrolyser Stacks and Balance of Plant: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-405Power Supply and Rectifiers: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-410Feed Water Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-415Hydrogen Compression: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-420Hydrogen Storage: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-425Purification and Drying: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-430Ammonia Synthesis Loop: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-435Ammonia Storage and Loading: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-440Carbon Capture Units: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-445Carbon Dioxide Compression and Transport: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-450Hydrogen Refuelling Stations: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-455Gas Detection, Ventilation and Emergency Shutdown: Checklists and Test RecordsWorking resource | Checklist setDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-510Hydrogen & Low-Carbon Fuels Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-520Hydrogen & Low-Carbon Fuels Issues and Deficiency LogWorking resource | ToolXLSX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-530Hydrogen & Low-Carbon Fuels Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-540Hydrogen & Low-Carbon Fuels Certificates and Release Records SetWorking resource | TemplateDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-550Hydrogen & Low-Carbon Fuels Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-610Operational Readiness for Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-620Readiness Criteria Library for Hydrogen & Low-Carbon FuelsWorking resource | ToolXLSX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-630Staffing, Training and Competence for Hydrogen & Low-Carbon Fuels OperationsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-640Operating Procedures Set for Hydrogen & Low-Carbon FuelsWorking resource | TemplateDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-650Maintenance, Spares and Asset Data Readiness for Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-660Ramp-Up and Stabilization in Hydrogen & Low-Carbon FuelsReading reference | GuidePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-710Hydrogen & Low-Carbon Fuels Handover Dossier IndexWorking resource | ToolXLSX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-720Hydrogen & Low-Carbon Fuels Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Hydrogen & Low-Carbon Fuels |
| ICXA-409-810Standards, Codes and Regulatory Map for Hydrogen & Low-Carbon FuelsReading reference | ReferencePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-409-910Worked Example: A Hydrogen & Low-Carbon Fuels Project End to EndReading reference | Worked examplePDF | Hydrogen & Low-Carbon Fuels |
| ICXA-410-010Applying the ICxA Standards to NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-020Nuclear Terminology and Milestone CrosswalkReading reference | ReferencePDF | Nuclear |
| ICXA-410-030Roles, Contracting Models and Division of Responsibility in NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-040Nuclear Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Nuclear |
| ICXA-410-110Defining Outcomes and Outcome Requirements for NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-120Outcome Evidence Need: Worked Examples for NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-130Completion, Performance and Acceptance Tests in NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-140Lender, Insurer and Offtaker Evidence Interfaces in NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-150Outcome Risk and Residual Risk Library for NuclearWorking resource | ToolXLSX | Nuclear |
| ICXA-410-160Regulatory Hold Points as Outcome Stage-GatesReading reference | GuidePDF | Nuclear |
| ICXA-410-210Reference System Breakdown Structure for NuclearWorking resource | ToolXLSX | Nuclear |
| ICXA-410-220Nuclear Commissioning Plan - TemplateWorking resource | TemplateDOCX | Nuclear |
| ICXA-410-230Nuclear Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Nuclear |
| ICXA-410-240Deficiency Classification: Worked Examples for NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-250Construction Verification and System Turnover: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Nuclear |
| ICXA-410-255Pre-Operational (Cold) Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Nuclear |
| ICXA-410-260Hot Functional Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Nuclear |
| ICXA-410-265Fuel Load: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Nuclear |
| ICXA-410-270Initial Criticality and Low-Power Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Nuclear |
| ICXA-410-275Power Ascension Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Nuclear |
| ICXA-410-280Commercial Operation: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Nuclear |
| ICXA-410-300Commissioning Reactor Coolant System: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-305Commissioning Emergency Core Cooling and Safety Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-310Commissioning Containment: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-315Commissioning Instrumentation, Control and Reactor Protection: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-320Commissioning Turbine-Generator and Balance of Plant: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-325Commissioning Safety-Class Electrical and Emergency Diesel Generators: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-330Commissioning Fuel Handling: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-335Commissioning Radioactive Waste Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-340Commissioning Ventilation and Radiation Monitoring: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-345Commissioning Cooling Water Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-350Commissioning Small Modular Reactor Modules: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Nuclear |
| ICXA-410-400Reactor Coolant System: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-405Emergency Core Cooling and Safety Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-410Containment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-415Instrumentation, Control and Reactor Protection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-420Turbine-Generator and Balance of Plant: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-425Safety-Class Electrical and Emergency Diesel Generators: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-430Fuel Handling: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-435Radioactive Waste Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-440Ventilation and Radiation Monitoring: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-445Cooling Water Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-450Small Modular Reactor Modules: Checklists and Test RecordsWorking resource | Checklist setDOCX | Nuclear |
| ICXA-410-510Nuclear Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Nuclear |
| ICXA-410-520Nuclear Issues and Deficiency LogWorking resource | ToolXLSX | Nuclear |
| ICXA-410-530Nuclear Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Nuclear |
| ICXA-410-540Nuclear Certificates and Release Records SetWorking resource | TemplateDOCX | Nuclear |
| ICXA-410-550Nuclear Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Nuclear |
| ICXA-410-610Operational Readiness for NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-620Readiness Criteria Library for NuclearWorking resource | ToolXLSX | Nuclear |
| ICXA-410-630Staffing, Training and Competence for Nuclear OperationsReading reference | GuidePDF | Nuclear |
| ICXA-410-640Operating Procedures Set for NuclearWorking resource | TemplateDOCX | Nuclear |
| ICXA-410-650Maintenance, Spares and Asset Data Readiness for NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-660Ramp-Up and Stabilization in NuclearReading reference | GuidePDF | Nuclear |
| ICXA-410-710Nuclear Handover Dossier IndexWorking resource | ToolXLSX | Nuclear |
| ICXA-410-720Nuclear Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Nuclear |
| ICXA-410-810Standards, Codes and Regulatory Map for NuclearReading reference | ReferencePDF | Nuclear |
| ICXA-410-910Worked Example: A Nuclear Project End to EndReading reference | Worked examplePDF | Nuclear |
| ICXA-411-010Applying the ICxA Standards to Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-020Advanced Manufacturing Terminology and Milestone CrosswalkReading reference | ReferencePDF | Advanced Manufacturing |
| ICXA-411-030Roles, Contracting Models and Division of Responsibility in Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-040Advanced Manufacturing Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Advanced Manufacturing |
| ICXA-411-110Defining Outcomes and Outcome Requirements for Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-120Outcome Evidence Need: Worked Examples for Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-130Completion, Performance and Acceptance Tests in Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-140Lender, Insurer and Offtaker Evidence Interfaces in Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-150Outcome Risk and Residual Risk Library for Advanced ManufacturingWorking resource | ToolXLSX | Advanced Manufacturing |
| ICXA-411-210Reference System Breakdown Structure for Advanced ManufacturingWorking resource | ToolXLSX | Advanced Manufacturing |
| ICXA-411-220Advanced Manufacturing Commissioning Plan - TemplateWorking resource | TemplateDOCX | Advanced Manufacturing |
| ICXA-411-230Advanced Manufacturing Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Advanced Manufacturing |
| ICXA-411-240Deficiency Classification: Worked Examples for Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-250Base-Build Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Advanced Manufacturing |
| ICXA-411-255Facility Systems Qualification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Advanced Manufacturing |
| ICXA-411-260Tool Install and Hook-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Advanced Manufacturing |
| ICXA-411-265Tool Start-Up and Qualification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Advanced Manufacturing |
| ICXA-411-270Process Qualification and Ramp: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Advanced Manufacturing |
| ICXA-411-300Commissioning Cleanroom, Make-Up Air and Fan Filter Units: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-305Commissioning Ultra-Pure Water: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-310Commissioning Bulk and Specialty Gases: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-315Commissioning Chemical Distribution: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-320Commissioning Exhaust and Abatement: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-325Commissioning Process Cooling Water: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-330Commissioning Electrical Distribution and UPS: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-335Commissioning Facility Monitoring and Control: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-340Commissioning Industrial Wastewater Treatment: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-345Commissioning Battery Dry Rooms: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-350Commissioning Automated Material Handling: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Advanced Manufacturing |
| ICXA-411-400Cleanroom, Make-Up Air and Fan Filter Units: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-405Ultra-Pure Water: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-410Bulk and Specialty Gases: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-415Chemical Distribution: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-420Exhaust and Abatement: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-425Process Cooling Water: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-430Electrical Distribution and UPS: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-435Facility Monitoring and Control: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-440Industrial Wastewater Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-445Battery Dry Rooms: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-450Automated Material Handling: Checklists and Test RecordsWorking resource | Checklist setDOCX | Advanced Manufacturing |
| ICXA-411-510Advanced Manufacturing Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Advanced Manufacturing |
| ICXA-411-520Advanced Manufacturing Issues and Deficiency LogWorking resource | ToolXLSX | Advanced Manufacturing |
| ICXA-411-530Advanced Manufacturing Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Advanced Manufacturing |
| ICXA-411-540Advanced Manufacturing Certificates and Release Records SetWorking resource | TemplateDOCX | Advanced Manufacturing |
| ICXA-411-550Advanced Manufacturing Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Advanced Manufacturing |
| ICXA-411-610Operational Readiness for Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-620Readiness Criteria Library for Advanced ManufacturingWorking resource | ToolXLSX | Advanced Manufacturing |
| ICXA-411-630Staffing, Training and Competence for Advanced Manufacturing OperationsReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-640Operating Procedures Set for Advanced ManufacturingWorking resource | TemplateDOCX | Advanced Manufacturing |
| ICXA-411-650Maintenance, Spares and Asset Data Readiness for Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-660Ramp-Up and Stabilization in Advanced ManufacturingReading reference | GuidePDF | Advanced Manufacturing |
| ICXA-411-710Advanced Manufacturing Handover Dossier IndexWorking resource | ToolXLSX | Advanced Manufacturing |
| ICXA-411-720Advanced Manufacturing Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Advanced Manufacturing |
| ICXA-411-810Standards, Codes and Regulatory Map for Advanced ManufacturingReading reference | ReferencePDF | Advanced Manufacturing |
| ICXA-411-910Worked Example: An Advanced Manufacturing Project End to EndReading reference | Worked examplePDF | Advanced Manufacturing |
| ICXA-412-010Applying the ICxA Standards to Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-020Chemicals, Polymers & Industrial Gases Terminology and Milestone CrosswalkReading reference | ReferencePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-030Roles, Contracting Models and Division of Responsibility in Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-040Chemicals, Polymers & Industrial Gases Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-110Defining Outcomes and Outcome Requirements for Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-120Outcome Evidence Need: Worked Examples for Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-130Completion, Performance and Acceptance Tests in Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-140Lender, Insurer and Offtaker Evidence Interfaces in Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-150Outcome Risk and Residual Risk Library for Chemicals, Polymers & Industrial GasesWorking resource | ToolXLSX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-210Reference System Breakdown Structure for Chemicals, Polymers & Industrial GasesWorking resource | ToolXLSX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-220Chemicals, Polymers & Industrial Gases Commissioning Plan - TemplateWorking resource | TemplateDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-230Chemicals, Polymers & Industrial Gases Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-240Deficiency Classification: Worked Examples for Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-250Mechanical Completion and Pre-Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-255Commissioning with Water and Solvent Runs: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-260Pre-Start-Up Safety Review and First Feed Readiness: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-265Catalyst Loading, Start-Up and On-Spec Product: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-270Performance Guarantee Testing and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-300Commissioning Electrochemical Cells, Rectifiers and Brine Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-305Commissioning Continuous Reactors and Catalyst Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-310Commissioning Batch Reactors and Multipurpose Batch Plants: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-315Commissioning Distillation, Separation and Purification Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-320Commissioning Polymer Finishing and Solids Handling: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-325Commissioning Process Utilities and Effluent Treatment: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-330Commissioning Air Separation Units and Industrial Gas Supply: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-335Commissioning Chlorine and Toxic Gas Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-340Commissioning Safety Instrumented Systems and Process Control: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-345Commissioning Relief, Flare and Vent Treatment Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-350Commissioning Storage Tanks, Terminals and Loading Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-400Electrochemical Cells, Rectifiers and Brine Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-405Continuous Reactors and Catalyst Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-410Batch Reactors and Multipurpose Batch Plants: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-415Distillation, Separation and Purification Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-420Polymer Finishing and Solids Handling: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-425Process Utilities and Effluent Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-430Air Separation Units and Industrial Gas Supply: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-435Chlorine and Toxic Gas Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-440Safety Instrumented Systems and Process Control: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-445Relief, Flare and Vent Treatment Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-450Storage Tanks, Terminals and Loading Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-510Chemicals, Polymers & Industrial Gases Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-520Chemicals, Polymers & Industrial Gases Issues and Deficiency LogWorking resource | ToolXLSX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-530Chemicals, Polymers & Industrial Gases Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-540Chemicals, Polymers & Industrial Gases Certificates and Release Records SetWorking resource | TemplateDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-550Chemicals, Polymers & Industrial Gases Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-610Operational Readiness for Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-620Readiness Criteria Library for Chemicals, Polymers & Industrial GasesWorking resource | ToolXLSX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-630Staffing, Training and Competence for Chemicals, Polymers & Industrial Gases OperationsReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-640Operating Procedures Set for Chemicals, Polymers & Industrial GasesWorking resource | TemplateDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-650Maintenance, Spares and Asset Data Readiness for Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-660Ramp-Up and Stabilization in Chemicals, Polymers & Industrial GasesReading reference | GuidePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-710Chemicals, Polymers & Industrial Gases Handover Dossier IndexWorking resource | ToolXLSX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-720Chemicals, Polymers & Industrial Gases Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Chemicals, Polymers & Industrial Gases |
| ICXA-412-810Standards, Codes and Regulatory Map for Chemicals, Polymers & Industrial GasesReading reference | ReferencePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-412-910Worked Example: A Chemicals, Polymers & Industrial Gases Project End to EndReading reference | Worked examplePDF | Chemicals, Polymers & Industrial Gases |
| ICXA-413-010Applying the ICxA Standards to Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-020Metals Production & Mineral Refining Terminology and Milestone CrosswalkReading reference | ReferencePDF | Metals Production & Mineral Refining |
| ICXA-413-030Roles, Contracting Models and Division of Responsibility in Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-040Metals Production & Mineral Refining Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Metals Production & Mineral Refining |
| ICXA-413-110Defining Outcomes and Outcome Requirements for Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-120Outcome Evidence Need: Worked Examples for Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-130Completion, Performance and Acceptance Tests in Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-140Lender, Insurer and Offtaker Evidence Interfaces in Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-150Outcome Risk and Residual Risk Library for Metals Production & Mineral RefiningWorking resource | ToolXLSX | Metals Production & Mineral Refining |
| ICXA-413-210Reference System Breakdown Structure for Metals Production & Mineral RefiningWorking resource | ToolXLSX | Metals Production & Mineral Refining |
| ICXA-413-220Metals Production & Mineral Refining Commissioning Plan - TemplateWorking resource | TemplateDOCX | Metals Production & Mineral Refining |
| ICXA-413-230Metals Production & Mineral Refining Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Metals Production & Mineral Refining |
| ICXA-413-240Deficiency Classification: Worked Examples for Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-250Construction Completion and Pre-Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-255Cold Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-260Refractory Dry-Out and Heat-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-265First Metal and Hot Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-270Performance Testing and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-300Commissioning Direct Reduction and Ironmaking Plants: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-305Commissioning Electric Arc Furnaces and Ladle Metallurgy: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-310Commissioning Continuous Casters: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-315Commissioning Hot and Cold Rolling Mills: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-320Commissioning Aluminium Reduction Potlines: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-325Commissioning High-Current DC Rectifiers and Busbars: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-330Commissioning Smelting and Converting Furnaces: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-335Commissioning Off-Gas Handling, Gas Cleaning and Acid Plants: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-340Commissioning Electrorefining and Electrowinning Tankhouses: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-345Commissioning Hydrometallurgical Refining Circuits: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-350Commissioning Molten Metal Handling, Ladles and Metallurgical Cranes: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Metals Production & Mineral Refining |
| ICXA-413-400Direct Reduction and Ironmaking Plants: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-405Electric Arc Furnaces and Ladle Metallurgy: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-410Continuous Casters: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-415Hot and Cold Rolling Mills: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-420Aluminium Reduction Potlines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-425High-Current DC Rectifiers and Busbars: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-430Smelting and Converting Furnaces: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-435Off-Gas Handling, Gas Cleaning and Acid Plants: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-440Electrorefining and Electrowinning Tankhouses: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-445Hydrometallurgical Refining Circuits: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-450Molten Metal Handling, Ladles and Metallurgical Cranes: Checklists and Test RecordsWorking resource | Checklist setDOCX | Metals Production & Mineral Refining |
| ICXA-413-510Metals Production & Mineral Refining Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Metals Production & Mineral Refining |
| ICXA-413-520Metals Production & Mineral Refining Issues and Deficiency LogWorking resource | ToolXLSX | Metals Production & Mineral Refining |
| ICXA-413-530Metals Production & Mineral Refining Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Metals Production & Mineral Refining |
| ICXA-413-540Metals Production & Mineral Refining Certificates and Release Records SetWorking resource | TemplateDOCX | Metals Production & Mineral Refining |
| ICXA-413-550Metals Production & Mineral Refining Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Metals Production & Mineral Refining |
| ICXA-413-610Operational Readiness for Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-620Readiness Criteria Library for Metals Production & Mineral RefiningWorking resource | ToolXLSX | Metals Production & Mineral Refining |
| ICXA-413-630Staffing, Training and Competence for Metals Production & Mineral Refining OperationsReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-640Operating Procedures Set for Metals Production & Mineral RefiningWorking resource | TemplateDOCX | Metals Production & Mineral Refining |
| ICXA-413-650Maintenance, Spares and Asset Data Readiness for Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-660Ramp-Up and Stabilization in Metals Production & Mineral RefiningReading reference | GuidePDF | Metals Production & Mineral Refining |
| ICXA-413-710Metals Production & Mineral Refining Handover Dossier IndexWorking resource | ToolXLSX | Metals Production & Mineral Refining |
| ICXA-413-720Metals Production & Mineral Refining Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Metals Production & Mineral Refining |
| ICXA-413-810Standards, Codes and Regulatory Map for Metals Production & Mineral RefiningReading reference | ReferencePDF | Metals Production & Mineral Refining |
| ICXA-413-910Worked Example: A Metals Production & Mineral Refining Project End to EndReading reference | Worked examplePDF | Metals Production & Mineral Refining |
| ICXA-414-010Applying the ICxA Standards to Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-020Pulp, Paper & Forest Products Terminology and Milestone CrosswalkReading reference | ReferencePDF | Pulp, Paper & Forest Products |
| ICXA-414-030Roles, Contracting Models and Division of Responsibility in Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-040Pulp, Paper & Forest Products Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Pulp, Paper & Forest Products |
| ICXA-414-110Defining Outcomes and Outcome Requirements for Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-120Outcome Evidence Need: Worked Examples for Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-130Completion, Performance and Acceptance Tests in Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-140Lender, Insurer and Offtaker Evidence Interfaces in Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-150Outcome Risk and Residual Risk Library for Pulp, Paper & Forest ProductsWorking resource | ToolXLSX | Pulp, Paper & Forest Products |
| ICXA-414-210Reference System Breakdown Structure for Pulp, Paper & Forest ProductsWorking resource | ToolXLSX | Pulp, Paper & Forest Products |
| ICXA-414-220Pulp, Paper & Forest Products Commissioning Plan - TemplateWorking resource | TemplateDOCX | Pulp, Paper & Forest Products |
| ICXA-414-230Pulp, Paper & Forest Products Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Pulp, Paper & Forest Products |
| ICXA-414-240Deficiency Classification: Worked Examples for Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-250Construction Completion, Pre-Commissioning and Shutdown Tie-Ins: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-255Water Runs and Functional Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-260First Fire, Boil-Out, Dry-Out and Steam Blows: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-265First Liquor, First Chemicals and Process Start-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-270Performance Testing, Trial Operation and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-300Commissioning Black Liquor Recovery Boilers: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-305Commissioning Evaporators, Concentrators and Non-Condensable Gas Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-310Commissioning Digesters, Washing and Oxygen Delignification: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-315Commissioning Bleach Plants and Chlorine Dioxide Generation: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-320Commissioning Recausticizing and Lime Kilns: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-325Commissioning Power Boilers, Turbine Generators and Mill Steam Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-330Commissioning Paper and Board Machines: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-335Commissioning Mechanical Pulping, Stock Preparation and Recycled Fibre Lines: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-340Commissioning Tissue Machines and Yankee Dryers: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-345Commissioning Mill Water and Effluent Treatment Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-350Commissioning Sawmill, Panel and Mass Timber Plants: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Pulp, Paper & Forest Products |
| ICXA-414-400Black Liquor Recovery Boilers: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-405Evaporators, Concentrators and Non-Condensable Gas Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-410Digesters, Washing and Oxygen Delignification: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-415Bleach Plants and Chlorine Dioxide Generation: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-420Recausticizing and Lime Kilns: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-425Power Boilers, Turbine Generators and Mill Steam Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-430Paper and Board Machines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-435Mechanical Pulping, Stock Preparation and Recycled Fibre Lines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-440Tissue Machines and Yankee Dryers: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-445Mill Water and Effluent Treatment Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-450Sawmill, Panel and Mass Timber Plants: Checklists and Test RecordsWorking resource | Checklist setDOCX | Pulp, Paper & Forest Products |
| ICXA-414-510Pulp, Paper & Forest Products Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Pulp, Paper & Forest Products |
| ICXA-414-520Pulp, Paper & Forest Products Issues and Deficiency LogWorking resource | ToolXLSX | Pulp, Paper & Forest Products |
| ICXA-414-530Pulp, Paper & Forest Products Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Pulp, Paper & Forest Products |
| ICXA-414-540Pulp, Paper & Forest Products Certificates and Release Records SetWorking resource | TemplateDOCX | Pulp, Paper & Forest Products |
| ICXA-414-550Pulp, Paper & Forest Products Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Pulp, Paper & Forest Products |
| ICXA-414-610Operational Readiness for Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-620Readiness Criteria Library for Pulp, Paper & Forest ProductsWorking resource | ToolXLSX | Pulp, Paper & Forest Products |
| ICXA-414-630Staffing, Training and Competence for Pulp, Paper & Forest Products OperationsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-640Operating Procedures Set for Pulp, Paper & Forest ProductsWorking resource | TemplateDOCX | Pulp, Paper & Forest Products |
| ICXA-414-650Maintenance, Spares and Asset Data Readiness for Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-660Ramp-Up and Stabilization in Pulp, Paper & Forest ProductsReading reference | GuidePDF | Pulp, Paper & Forest Products |
| ICXA-414-710Pulp, Paper & Forest Products Handover Dossier IndexWorking resource | ToolXLSX | Pulp, Paper & Forest Products |
| ICXA-414-720Pulp, Paper & Forest Products Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Pulp, Paper & Forest Products |
| ICXA-414-810Standards, Codes and Regulatory Map for Pulp, Paper & Forest ProductsReading reference | ReferencePDF | Pulp, Paper & Forest Products |
| ICXA-414-910Worked Example: A Pulp, Paper & Forest Products Project End to EndReading reference | Worked examplePDF | Pulp, Paper & Forest Products |
| ICXA-415-010Applying the ICxA Standards to Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-020Cement, Lime, Glass & Building Materials Terminology and Milestone CrosswalkReading reference | ReferencePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-030Roles, Contracting Models and Division of Responsibility in Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-040Cement, Lime, Glass & Building Materials Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-110Defining Outcomes and Outcome Requirements for Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-120Outcome Evidence Need: Worked Examples for Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-130Completion, Performance and Acceptance Tests in Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-140Lender, Insurer and Offtaker Evidence Interfaces in Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-150Outcome Risk and Residual Risk Library for Cement, Lime, Glass & Building MaterialsWorking resource | ToolXLSX | Cement, Lime, Glass & Building Materials |
| ICXA-415-210Reference System Breakdown Structure for Cement, Lime, Glass & Building MaterialsWorking resource | ToolXLSX | Cement, Lime, Glass & Building Materials |
| ICXA-415-220Cement, Lime, Glass & Building Materials Commissioning Plan - TemplateWorking resource | TemplateDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-230Cement, Lime, Glass & Building Materials Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Cement, Lime, Glass & Building Materials |
| ICXA-415-240Deficiency Classification: Worked Examples for Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-250Construction Completion and Pre-Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-255Cold Commissioning and No-Load Runs: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-260Refractory Dry-Out and Kiln and Furnace Heat-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-265Light-Up, Feed-On and Hot Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-270Performance Testing, Product Conformity and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-300Commissioning Raw Material Preparation, Raw Mills and Homogenization: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-305Commissioning Preheaters, Calciners and Rotary Kilns: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-310Commissioning Clinker Coolers and Clinker Handling: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-315Commissioning Coal Mills and Kiln Firing Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-320Commissioning Alternative Fuel and Raw Material Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-325Commissioning Cement Grinding, Storage and Dispatch: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-330Commissioning Lime Kilns and Hydrating Plants: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-335Commissioning Glass Batch Plants and Melting Furnaces: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-340Commissioning Float Glass Tin Baths, Annealing Lehrs and Cold Ends: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-345Commissioning Kiln and Furnace Gas Cleaning and Emissions Monitoring: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-350Commissioning Gypsum Wallboard, Ceramic and Brick, Ready-Mix and Precast Plants: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-400Raw Material Preparation, Raw Mills and Homogenization: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-405Preheaters, Calciners and Rotary Kilns: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-410Clinker Coolers and Clinker Handling: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-415Coal Mills and Kiln Firing Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-420Alternative Fuel and Raw Material Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-425Cement Grinding, Storage and Dispatch: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-430Lime Kilns and Hydrating Plants: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-435Glass Batch Plants and Melting Furnaces: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-440Float Glass Tin Baths, Annealing Lehrs and Cold Ends: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-445Kiln and Furnace Gas Cleaning and Emissions Monitoring: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-450Gypsum Wallboard, Ceramic and Brick, Ready-Mix and Precast Plants: Checklists and Test RecordsWorking resource | Checklist setDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-510Cement, Lime, Glass & Building Materials Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-520Cement, Lime, Glass & Building Materials Issues and Deficiency LogWorking resource | ToolXLSX | Cement, Lime, Glass & Building Materials |
| ICXA-415-530Cement, Lime, Glass & Building Materials Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-540Cement, Lime, Glass & Building Materials Certificates and Release Records SetWorking resource | TemplateDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-550Cement, Lime, Glass & Building Materials Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Cement, Lime, Glass & Building Materials |
| ICXA-415-610Operational Readiness for Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-620Readiness Criteria Library for Cement, Lime, Glass & Building MaterialsWorking resource | ToolXLSX | Cement, Lime, Glass & Building Materials |
| ICXA-415-630Staffing, Training and Competence for Cement, Lime, Glass & Building Materials OperationsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-640Operating Procedures Set for Cement, Lime, Glass & Building MaterialsWorking resource | TemplateDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-650Maintenance, Spares and Asset Data Readiness for Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-660Ramp-Up and Stabilization in Cement, Lime, Glass & Building MaterialsReading reference | GuidePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-710Cement, Lime, Glass & Building Materials Handover Dossier IndexWorking resource | ToolXLSX | Cement, Lime, Glass & Building Materials |
| ICXA-415-720Cement, Lime, Glass & Building Materials Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Cement, Lime, Glass & Building Materials |
| ICXA-415-810Standards, Codes and Regulatory Map for Cement, Lime, Glass & Building MaterialsReading reference | ReferencePDF | Cement, Lime, Glass & Building Materials |
| ICXA-415-910Worked Example: A Cement, Lime, Glass & Building Materials Project End to EndReading reference | Worked examplePDF | Cement, Lime, Glass & Building Materials |
| ICXA-416-010Applying the ICxA Standards to Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-020Food, Beverage & Agri-Processing Terminology and Milestone CrosswalkReading reference | ReferencePDF | Food, Beverage & Agri-Processing |
| ICXA-416-030Roles, Contracting Models and Division of Responsibility in Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-040Food, Beverage & Agri-Processing Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Food, Beverage & Agri-Processing |
| ICXA-416-110Defining Outcomes and Outcome Requirements for Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-120Outcome Evidence Need: Worked Examples for Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-130Completion, Performance and Acceptance Tests in Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-140Lender, Insurer and Offtaker Evidence Interfaces in Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-150Outcome Risk and Residual Risk Library for Food, Beverage & Agri-ProcessingWorking resource | ToolXLSX | Food, Beverage & Agri-Processing |
| ICXA-416-210Reference System Breakdown Structure for Food, Beverage & Agri-ProcessingWorking resource | ToolXLSX | Food, Beverage & Agri-Processing |
| ICXA-416-220Food, Beverage & Agri-Processing Commissioning Plan - TemplateWorking resource | TemplateDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-230Food, Beverage & Agri-Processing Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Food, Beverage & Agri-Processing |
| ICXA-416-240Deficiency Classification: Worked Examples for Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-250Construction Completion and Hygienic Installation Verification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-255Pre-Commissioning, Water Runs and Cold Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-260CIP, SIP and Sanitation Verification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-265First Production Runs and Line Trials: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-270Food Safety Validation, Performance Testing and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-300Commissioning Raw Material Receiving, Storage and Batching: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-305Commissioning Pasteurizers and Thermal Process Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-310Commissioning Aseptic Processing and Packaging Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-315Commissioning Evaporators and Spray Dryers: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-320Commissioning Clean-in-Place, Process Water and Culinary Steam Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-325Commissioning Ammonia and CO2 Refrigeration Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-330Commissioning Filling, Packaging and Product Inspection Lines: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-335Commissioning Bakery, Snack and Frying Lines: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-340Commissioning Grain Handling, Milling and Combustible Dust Controls: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-345Commissioning Meat, Poultry and Protein Processing Lines: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-350Commissioning Brewing, Distilling and Fermentation Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Food, Beverage & Agri-Processing |
| ICXA-416-400Raw Material Receiving, Storage and Batching: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-405Pasteurizers and Thermal Process Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-410Aseptic Processing and Packaging Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-415Evaporators and Spray Dryers: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-420Clean-in-Place, Process Water and Culinary Steam Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-425Ammonia and CO2 Refrigeration Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-430Filling, Packaging and Product Inspection Lines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-435Bakery, Snack and Frying Lines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-440Grain Handling, Milling and Combustible Dust Controls: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-445Meat, Poultry and Protein Processing Lines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-450Brewing, Distilling and Fermentation Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-510Food, Beverage & Agri-Processing Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-520Food, Beverage & Agri-Processing Issues and Deficiency LogWorking resource | ToolXLSX | Food, Beverage & Agri-Processing |
| ICXA-416-530Food, Beverage & Agri-Processing Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-540Food, Beverage & Agri-Processing Certificates and Release Records SetWorking resource | TemplateDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-550Food, Beverage & Agri-Processing Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Food, Beverage & Agri-Processing |
| ICXA-416-610Operational Readiness for Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-620Readiness Criteria Library for Food, Beverage & Agri-ProcessingWorking resource | ToolXLSX | Food, Beverage & Agri-Processing |
| ICXA-416-630Staffing, Training and Competence for Food, Beverage & Agri-Processing OperationsReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-640Operating Procedures Set for Food, Beverage & Agri-ProcessingWorking resource | TemplateDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-650Maintenance, Spares and Asset Data Readiness for Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-660Ramp-Up and Stabilization in Food, Beverage & Agri-ProcessingReading reference | GuidePDF | Food, Beverage & Agri-Processing |
| ICXA-416-710Food, Beverage & Agri-Processing Handover Dossier IndexWorking resource | ToolXLSX | Food, Beverage & Agri-Processing |
| ICXA-416-720Food, Beverage & Agri-Processing Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Food, Beverage & Agri-Processing |
| ICXA-416-810Standards, Codes and Regulatory Map for Food, Beverage & Agri-ProcessingReading reference | ReferencePDF | Food, Beverage & Agri-Processing |
| ICXA-416-910Worked Example: A Food, Beverage & Agri-Processing Project End to EndReading reference | Worked examplePDF | Food, Beverage & Agri-Processing |
| ICXA-417-010Applying the ICxA Standards to Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-020Logistics, Warehousing & Cold Chain Terminology and Milestone CrosswalkReading reference | ReferencePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-030Roles, Contracting Models and Division of Responsibility in Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-040Logistics, Warehousing & Cold Chain Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-110Defining Outcomes and Outcome Requirements for Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-120Outcome Evidence Need: Worked Examples for Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-130Completion, Performance and Acceptance Tests in Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-140Lender, Insurer and Offtaker Evidence Interfaces in Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-150Outcome Risk and Residual Risk Library for Logistics, Warehousing & Cold ChainWorking resource | ToolXLSX | Logistics, Warehousing & Cold Chain |
| ICXA-417-210Reference System Breakdown Structure for Logistics, Warehousing & Cold ChainWorking resource | ToolXLSX | Logistics, Warehousing & Cold Chain |
| ICXA-417-220Logistics, Warehousing & Cold Chain Commissioning Plan - TemplateWorking resource | TemplateDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-230Logistics, Warehousing & Cold Chain Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Logistics, Warehousing & Cold Chain |
| ICXA-417-240Deficiency Classification: Worked Examples for Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-250Installation, Mechanical Completion and Pre-Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-255Subsystem Commissioning and Site Acceptance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-260Refrigeration Start-Up, Pull-Down and Temperature Mapping: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-265Systems Integration, End-to-End Throughput and Volume Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-270Inventory Build, Wave Go-Live, Cutover and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-300Commissioning Conveyor and Sortation Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-305Commissioning Automated Storage and Retrieval Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-310Commissioning Cube Storage, Goods-to-Person and Robotic Picking Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-315Commissioning Autonomous Mobile Robots and Automated Guided Vehicles: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-320Commissioning Warehouse Management, Execution and Control Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-325Commissioning Ammonia Refrigeration Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-330Commissioning Carbon Dioxide and Glycol Secondary Refrigeration Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-335Commissioning Freezers, Cold Rooms, Blast Freezers and Temperature-Controlled Docks: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-340Commissioning Temperature Monitoring and Cold Chain Data Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-345Commissioning Fire Protection for High-Piled and Rack Storage: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-350Commissioning Docks, Yards, Fleet Fuelling and Electric Vehicle Charging: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-400Conveyor and Sortation Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-405Automated Storage and Retrieval Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-410Cube Storage, Goods-to-Person and Robotic Picking Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-415Autonomous Mobile Robots and Automated Guided Vehicles: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-420Warehouse Management, Execution and Control Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-425Ammonia Refrigeration Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-430Carbon Dioxide and Glycol Secondary Refrigeration Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-435Freezers, Cold Rooms, Blast Freezers and Temperature-Controlled Docks: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-440Temperature Monitoring and Cold Chain Data Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-445Fire Protection for High-Piled and Rack Storage: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-450Docks, Yards, Fleet Fuelling and Electric Vehicle Charging: Checklists and Test RecordsWorking resource | Checklist setDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-510Logistics, Warehousing & Cold Chain Test Script and Procedure Format - TemplateWorking resource | TemplateDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-520Logistics, Warehousing & Cold Chain Issues and Deficiency LogWorking resource | ToolXLSX | Logistics, Warehousing & Cold Chain |
| ICXA-417-530Logistics, Warehousing & Cold Chain Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-540Logistics, Warehousing & Cold Chain Certificates and Release Records SetWorking resource | TemplateDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-550Logistics, Warehousing & Cold Chain Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Logistics, Warehousing & Cold Chain |
| ICXA-417-610Operational Readiness for Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-620Readiness Criteria Library for Logistics, Warehousing & Cold ChainWorking resource | ToolXLSX | Logistics, Warehousing & Cold Chain |
| ICXA-417-630Staffing, Training and Competence for Logistics, Warehousing & Cold Chain OperationsReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-640Operating Procedures Set for Logistics, Warehousing & Cold ChainWorking resource | TemplateDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-650Maintenance, Spares and Asset Data Readiness for Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-660Ramp-Up and Stabilization in Logistics, Warehousing & Cold ChainReading reference | GuidePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-710Logistics, Warehousing & Cold Chain Handover Dossier IndexWorking resource | ToolXLSX | Logistics, Warehousing & Cold Chain |
| ICXA-417-720Logistics, Warehousing & Cold Chain Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Logistics, Warehousing & Cold Chain |
| ICXA-417-810Standards, Codes and Regulatory Map for Logistics, Warehousing & Cold ChainReading reference | ReferencePDF | Logistics, Warehousing & Cold Chain |
| ICXA-417-910Worked Example: A Logistics, Warehousing & Cold Chain Project End to EndReading reference | Worked examplePDF | Logistics, Warehousing & Cold Chain |
| ICXA-418-010Applying the ICxA Standards to Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-020Telecommunications & Networks Terminology and Milestone CrosswalkReading reference | ReferencePDF | Telecommunications & Networks |
| ICXA-418-030Roles, Contracting Models and Division of Responsibility in Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-040Telecommunications & Networks Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Telecommunications & Networks |
| ICXA-418-110Defining Outcomes and Outcome Requirements for Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-120Outcome Evidence Need: Worked Examples for Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-130Completion, Performance and Acceptance Tests in Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-140Lender, Insurer and Offtaker Evidence Interfaces in Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-150Outcome Risk and Residual Risk Library for Telecommunications & NetworksWorking resource | ToolXLSX | Telecommunications & Networks |
| ICXA-418-210Reference System Breakdown Structure for Telecommunications & NetworksWorking resource | ToolXLSX | Telecommunications & Networks |
| ICXA-418-220Telecommunications & Networks Commissioning Plan: TemplateWorking resource | TemplateDOCX | Telecommunications & Networks |
| ICXA-418-230Telecommunications & Networks Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Telecommunications & Networks |
| ICXA-418-240Deficiency Classification: Worked Examples for Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-250Outside Plant Construction Verification and Fibre Acceptance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Telecommunications & Networks |
| ICXA-418-255Site Build, Equipment Installation and Node Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Telecommunications & Networks |
| ICXA-418-260Network Integration, Service Activation and Network Acceptance Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Telecommunications & Networks |
| ICXA-418-265Soft Launch, Service Readiness and Commercial Launch: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Telecommunications & Networks |
| ICXA-418-270Customer Migration, Cutover Windows and Legacy Decommissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Telecommunications & Networks |
| ICXA-418-300Commissioning Outside Plant and Backbone Fibre Cable Networks: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-305Commissioning Optical Transport and DWDM Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-310Commissioning IP-MPLS Core, Aggregation and Interconnection Networks: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-315Commissioning Fibre-to-the-Premises Access Networks: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-320Commissioning Mobile Radio Access Networks, Small Cells and Antenna Structures: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-325Commissioning Mobile Core, Voice and Emergency Calling Platforms: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-330Commissioning Telecommunications Power Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-335Commissioning Network Operations Centres and OSS-BSS Platforms: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-340Commissioning Subsea Cable Systems and Cable Landing Stations: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-345Commissioning Satellite Ground Stations and Teleports: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-350Commissioning Broadcast Transmission Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Telecommunications & Networks |
| ICXA-418-400Outside Plant and Backbone Fibre Cable Networks: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-405Optical Transport and DWDM Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-410IP-MPLS Core, Aggregation and Interconnection Networks: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-415Fibre-to-the-Premises Access Networks: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-420Mobile Radio Access Networks, Small Cells and Antenna Structures: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-425Mobile Core, Voice and Emergency Calling Platforms: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-430Telecommunications Power Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-435Network Operations Centres and OSS-BSS Platforms: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-440Subsea Cable Systems and Cable Landing Stations: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-445Satellite Ground Stations and Teleports: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-450Broadcast Transmission Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Telecommunications & Networks |
| ICXA-418-510Telecommunications & Networks Test Script and Procedure Format: TemplateWorking resource | TemplateDOCX | Telecommunications & Networks |
| ICXA-418-520Telecommunications & Networks Issues and Deficiency LogWorking resource | ToolXLSX | Telecommunications & Networks |
| ICXA-418-530Telecommunications & Networks Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Telecommunications & Networks |
| ICXA-418-540Telecommunications & Networks Certificates and Release Records SetWorking resource | TemplateDOCX | Telecommunications & Networks |
| ICXA-418-550Telecommunications & Networks Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Telecommunications & Networks |
| ICXA-418-610Operational Readiness for Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-620Readiness Criteria Library for Telecommunications & NetworksWorking resource | ToolXLSX | Telecommunications & Networks |
| ICXA-418-630Staffing, Training and Competence for Telecommunications & Networks OperationsReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-640Operating Procedures Set for Telecommunications & NetworksWorking resource | TemplateDOCX | Telecommunications & Networks |
| ICXA-418-650Maintenance, Spares and Asset Data Readiness for Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-660Ramp-Up and Stabilization in Telecommunications & NetworksReading reference | GuidePDF | Telecommunications & Networks |
| ICXA-418-710Telecommunications & Networks Handover Dossier IndexWorking resource | ToolXLSX | Telecommunications & Networks |
| ICXA-418-720Telecommunications & Networks Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Telecommunications & Networks |
| ICXA-418-810Standards, Codes and Regulatory Map for Telecommunications & NetworksReading reference | ReferencePDF | Telecommunications & Networks |
| ICXA-418-910Worked Example: A Telecommunications & Networks Project End to EndReading reference | Worked examplePDF | Telecommunications & Networks |
| ICXA-419-010Applying the ICxA Standards to Shipbuilding, Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-020Shipbuilding, Marine Vessels & Offshore Units Terminology and Milestone CrosswalkReading reference | ReferencePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-030Roles, Contracting Models and Division of Responsibility in Shipbuilding, Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-040Shipbuilding, Marine Vessels & Offshore Units Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-110Defining Outcomes and Outcome Requirements for Shipbuilding, Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-120Outcome Evidence Need: Worked Examples for Shipbuilding, Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-130Completion, Performance and Acceptance Tests in Shipbuilding, Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-140Lender, Insurer and Offtaker Evidence Interfaces in Shipbuilding, Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-150Outcome Risk and Residual Risk Library for Shipbuilding, Marine Vessels & Offshore UnitsWorking resource | ToolXLSX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-210Reference System Breakdown Structure for Shipbuilding, Marine Vessels & Offshore UnitsWorking resource | ToolXLSX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-220Shipbuilding, Marine Vessels & Offshore Units Commissioning Plan: TemplateWorking resource | TemplateDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-230Shipbuilding, Marine Vessels & Offshore Units Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-240Deficiency Classification: Worked Examples for Shipbuilding, Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-250Block Construction, Outfitting and Systems Completion: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-255Harbour Acceptance Tests and Dock Trials: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-260Inclining Experiment and Sea Trials: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-265Gas Trials, Gassing-Up and First Gas Operations: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-270Delivery, Acceptance, Entry into Service and Guarantee Period: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-300Commissioning Propulsion, Thrusters and Steering: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-305Commissioning Power Generation, Battery Hybrid Systems and Power Management: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-310Commissioning LNG Fuel Containment, Fuel Gas Supply and Bunkering: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-315Commissioning Integrated Automation, Alarm and Monitoring Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-320Commissioning Navigation, Bridge and Radiocommunication Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-325Commissioning Fire Detection, Fire-Fighting and Fire Containment Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-330Commissioning Life-Saving Appliances and Evacuation Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-335Commissioning Watertight Integrity, Ro-Ro Access, Ballast and Bilge Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-340Commissioning Ballast Water, Oily Water, Sewage and Emissions Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-345Commissioning Cargo Containment and Cargo Handling on Gas Carriers: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-350Commissioning Dynamic Positioning, Jacking and Crane Systems on Offshore Units: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-400Propulsion, Thrusters and Steering: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-405Power Generation, Battery Hybrid Systems and Power Management: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-410LNG Fuel Containment, Fuel Gas Supply and Bunkering: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-415Integrated Automation, Alarm and Monitoring Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-420Navigation, Bridge and Radiocommunication Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-425Fire Detection, Fire-Fighting and Fire Containment Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-430Life-Saving Appliances and Evacuation Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-435Watertight Integrity, Ro-Ro Access, Ballast and Bilge Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-440Ballast Water, Oily Water, Sewage and Emissions Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-445Cargo Containment and Cargo Handling on Gas Carriers: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-450Dynamic Positioning, Jacking and Crane Systems on Offshore Units: Checklists and Test RecordsWorking resource | Checklist setDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-510Shipbuilding, Marine Vessels & Offshore Units Test Script and Procedure Format: TemplateWorking resource | TemplateDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-520Shipbuilding, Marine Vessels & Offshore Units Issues and Deficiency LogWorking resource | ToolXLSX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-530Shipbuilding, Marine Vessels & Offshore Units Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-540Shipbuilding, Marine Vessels & Offshore Units Certificates and Release Records SetWorking resource | TemplateDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-550Shipbuilding, Marine Vessels & Offshore Units Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-610Operational Readiness for Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-620Readiness Criteria Library for Marine Vessels & Offshore UnitsWorking resource | ToolXLSX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-630Staffing, Training and Competence for Vessel and Offshore Unit OperationsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-640Operating Procedures Set for Marine Vessels & Offshore UnitsWorking resource | TemplateDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-650Maintenance, Spares and Asset Data Readiness for Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-660Ramp-Up and Stabilization for Marine Vessels & Offshore UnitsReading reference | GuidePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-710Shipbuilding, Marine Vessels & Offshore Units Handover Dossier IndexWorking resource | ToolXLSX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-720Shipbuilding, Marine Vessels & Offshore Units Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-810Standards, Codes and Regulatory Map for Shipbuilding, Marine Vessels & Offshore UnitsReading reference | ReferencePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-419-910Worked Example: A Vessel Newbuilding Project End to EndReading reference | Worked examplePDF | Shipbuilding, Marine Vessels & Offshore Units |
| ICXA-420-010Applying the ICxA Standards to Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-020Carbon Capture, Transport & Storage Terminology and Milestone CrosswalkReading reference | ReferencePDF | Carbon Capture, Transport & Storage |
| ICXA-420-030Roles, Contracting Models and Division of Responsibility in Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-040Carbon Capture, Transport & Storage Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Carbon Capture, Transport & Storage |
| ICXA-420-110Defining Outcomes and Outcome Requirements for Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-120Outcome Evidence Need: Worked Examples for Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-130Completion, Performance and Acceptance Tests in Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-140Lender, Insurer and Offtaker Evidence Interfaces in Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-150Outcome Risk and Residual Risk Library for Carbon Capture, Transport & StorageWorking resource | ToolXLSX | Carbon Capture, Transport & Storage |
| ICXA-420-210Reference System Breakdown Structure for Carbon Capture, Transport & StorageWorking resource | ToolXLSX | Carbon Capture, Transport & Storage |
| ICXA-420-220Carbon Capture, Transport & Storage Commissioning Plan: TemplateWorking resource | TemplateDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-230Carbon Capture, Transport & Storage Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Carbon Capture, Transport & Storage |
| ICXA-420-240Deficiency Classification: Worked Examples for Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-250Construction Completion, Pre-Commissioning and Well Completion Verification: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-255Capture Plant Commissioning, Solvent Circulation and First Flue Gas: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-260Pipeline Drying, Line Fill and First Injection: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-265Capture Rate, Performance Testing and Trial Operation: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-270Commercial Operation, Measurement and Monitoring Verification and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-300Commissioning Flue Gas Pretreatment and Direct Contact Cooling Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-305Commissioning Solvent-Based Capture Units and Solvent Management: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-310Commissioning Steam Supply, Heat Integration and Host Plant Interfaces: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-315Commissioning CO2 Compression, Dehydration and Conditioning Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-320Commissioning Direct Air Capture Plants: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-325Commissioning CO2 Pipelines and Block Valve Stations: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-330Commissioning CO2 Metering, Composition Analysis and Custody Transfer Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-335Commissioning CO2 Injection Wells and Wellsites: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-340Commissioning Storage Site Monitoring, Measurement and Verification Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-345Commissioning CO2 Liquefaction, Shipping and Terminal Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-350Commissioning Control, Safety Instrumented and CO2 Detection Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Carbon Capture, Transport & Storage |
| ICXA-420-400Flue Gas Pretreatment and Direct Contact Cooling Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-405Solvent-Based Capture Units and Solvent Management: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-410Steam Supply, Heat Integration and Host Plant Interfaces: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-415CO2 Compression, Dehydration and Conditioning Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-420Direct Air Capture Plants: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-425CO2 Pipelines and Block Valve Stations: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-430CO2 Metering, Composition Analysis and Custody Transfer Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-435CO2 Injection Wells and Wellsites: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-440Storage Site Monitoring, Measurement and Verification Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-445CO2 Liquefaction, Shipping and Terminal Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-450Control, Safety Instrumented and CO2 Detection Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-510Carbon Capture, Transport & Storage Test Script and Procedure Format: TemplateWorking resource | TemplateDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-520Carbon Capture, Transport & Storage Issues and Deficiency LogWorking resource | ToolXLSX | Carbon Capture, Transport & Storage |
| ICXA-420-530Carbon Capture, Transport & Storage Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-540Carbon Capture, Transport & Storage Certificates and Release Records SetWorking resource | TemplateDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-550Carbon Capture, Transport & Storage Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Carbon Capture, Transport & Storage |
| ICXA-420-610Operational Readiness for Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-620Readiness Criteria Library for Carbon Capture, Transport & StorageWorking resource | ToolXLSX | Carbon Capture, Transport & Storage |
| ICXA-420-630Staffing, Training and Competence for Carbon Capture, Transport & Storage OperationsReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-640Operating Procedures Set for Carbon Capture, Transport & StorageWorking resource | TemplateDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-650Maintenance, Spares and Asset Data Readiness for Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-660Ramp-Up and Stabilization in Carbon Capture, Transport & StorageReading reference | GuidePDF | Carbon Capture, Transport & Storage |
| ICXA-420-710Carbon Capture, Transport & Storage Handover Dossier IndexWorking resource | ToolXLSX | Carbon Capture, Transport & Storage |
| ICXA-420-720Carbon Capture, Transport & Storage Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Carbon Capture, Transport & Storage |
| ICXA-420-810Standards, Codes and Regulatory Map for Carbon Capture, Transport & StorageReading reference | ReferencePDF | Carbon Capture, Transport & Storage |
| ICXA-420-910Worked Example: A Carbon Capture, Transport & Storage Project End to EndReading reference | Worked examplePDF | Carbon Capture, Transport & Storage |
| ICXA-421-010Applying the ICxA Standards to Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-020Waste, Recycling & Bioenergy Terminology and Milestone CrosswalkReading reference | ReferencePDF | Waste, Recycling & Bioenergy |
| ICXA-421-030Roles, Contracting Models and Division of Responsibility in Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-040Waste, Recycling & Bioenergy Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Waste, Recycling & Bioenergy |
| ICXA-421-110Defining Outcomes and Outcome Requirements for Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-120Outcome Evidence Need: Worked Examples for Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-130Completion, Performance and Acceptance Tests in Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-140Lender, Insurer and Offtaker Evidence Interfaces in Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-150Outcome Risk and Residual Risk Library for Waste, Recycling & BioenergyWorking resource | ToolXLSX | Waste, Recycling & Bioenergy |
| ICXA-421-210Reference System Breakdown Structure for Waste, Recycling & BioenergyWorking resource | ToolXLSX | Waste, Recycling & Bioenergy |
| ICXA-421-220Waste, Recycling & Bioenergy Commissioning Plan: TemplateWorking resource | TemplateDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-230Waste, Recycling & Bioenergy Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Waste, Recycling & Bioenergy |
| ICXA-421-240Deficiency Classification: Worked Examples for Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-250Construction Completion and Cold Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-255First Fire, Boiler Preparation and Digester Seeding: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-260Feedstock Reception, Storage Readiness and First Feed: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-265Hot Commissioning, Emissions Compliance and Reliability Run: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-270Performance Testing, Taking Over and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-300Commissioning Waste Reception, Bunkers, Waste Cranes and Bunker Fire Protection: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-305Commissioning Combustion Systems, Auxiliary Burners and Combustion Control: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-310Commissioning Energy Recovery Boilers and Water-Steam Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-315Commissioning Flue Gas Treatment and Continuous Emissions Monitoring Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-320Commissioning Steam Turbine-Generators, Grid Connection and Heat Export: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-325Commissioning Bottom Ash and Air Pollution Control Residue Handling: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-330Commissioning Materials Recovery Facilities and Plastics Recycling Lines: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-335Commissioning Battery Recycling, Hazardous and Clinical Waste Treatment Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-340Commissioning Anaerobic Digestion and Organics Processing Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-345Commissioning Biogas Upgrading, Renewable Natural Gas Injection and Landfill Gas Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-350Commissioning Biofuel Process Units: Fuel Ethanol, Biodiesel and Pyrolysis Oil: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Waste, Recycling & Bioenergy |
| ICXA-421-400Waste Reception, Bunkers, Waste Cranes and Bunker Fire Protection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-405Combustion Systems, Auxiliary Burners and Combustion Control: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-410Energy Recovery Boilers and Water-Steam Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-415Flue Gas Treatment and Continuous Emissions Monitoring Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-420Steam Turbine-Generators, Grid Connection and Heat Export: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-425Bottom Ash and Air Pollution Control Residue Handling: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-430Materials Recovery Facilities and Plastics Recycling Lines: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-435Battery Recycling, Hazardous and Clinical Waste Treatment Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-440Anaerobic Digestion and Organics Processing Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-445Biogas Upgrading, Renewable Natural Gas Injection and Landfill Gas Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-450Biofuel Process Units: Fuel Ethanol, Biodiesel and Pyrolysis Oil: Checklists and Test RecordsWorking resource | Checklist setDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-510Waste, Recycling & Bioenergy Test Script and Procedure Format: TemplateWorking resource | TemplateDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-520Waste, Recycling & Bioenergy Issues and Deficiency LogWorking resource | ToolXLSX | Waste, Recycling & Bioenergy |
| ICXA-421-530Waste, Recycling & Bioenergy Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-540Waste, Recycling & Bioenergy Certificates and Release Records SetWorking resource | TemplateDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-550Waste, Recycling & Bioenergy Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Waste, Recycling & Bioenergy |
| ICXA-421-610Operational Readiness for Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-620Readiness Criteria Library for Waste, Recycling & BioenergyWorking resource | ToolXLSX | Waste, Recycling & Bioenergy |
| ICXA-421-630Staffing, Training and Competence for Waste, Recycling & Bioenergy OperationsReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-640Operating Procedures Set for Waste, Recycling & BioenergyWorking resource | TemplateDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-650Maintenance, Spares and Asset Data Readiness for Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-660Ramp-Up and Stabilization in Waste, Recycling & BioenergyReading reference | GuidePDF | Waste, Recycling & Bioenergy |
| ICXA-421-710Waste, Recycling & Bioenergy Handover Dossier IndexWorking resource | ToolXLSX | Waste, Recycling & Bioenergy |
| ICXA-421-720Waste, Recycling & Bioenergy Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Waste, Recycling & Bioenergy |
| ICXA-421-810Standards, Codes and Regulatory Map for Waste, Recycling & BioenergyReading reference | ReferencePDF | Waste, Recycling & Bioenergy |
| ICXA-421-910Worked Example: A Waste, Recycling & Bioenergy Project End to EndReading reference | Worked examplePDF | Waste, Recycling & Bioenergy |
| ICXA-422-010Applying the ICxA Standards to District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-020District Energy & Thermal Networks Terminology and Milestone CrosswalkReading reference | ReferencePDF | District Energy & Thermal Networks |
| ICXA-422-030Roles, Contracting Models and Division of Responsibility in District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-040District Energy & Thermal Networks Lifecycle and Stage-Gate MapReading reference | ReferencePDF | District Energy & Thermal Networks |
| ICXA-422-110Defining Outcomes and Outcome Requirements for District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-120Outcome Evidence Need: Worked Examples for District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-130Completion, Performance and Acceptance Tests in District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-140Lender, Insurer and Offtaker Evidence Interfaces in District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-150Outcome Risk and Residual Risk Library for District Energy & Thermal NetworksWorking resource | ToolXLSX | District Energy & Thermal Networks |
| ICXA-422-210Reference System Breakdown Structure for District Energy & Thermal NetworksWorking resource | ToolXLSX | District Energy & Thermal Networks |
| ICXA-422-220District Energy & Thermal Networks Commissioning Plan: TemplateWorking resource | TemplateDOCX | District Energy & Thermal Networks |
| ICXA-422-230District Energy & Thermal Networks Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | District Energy & Thermal Networks |
| ICXA-422-240Deficiency Classification: Worked Examples for District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-250Construction Completion, Pressure Testing and Network Surveillance: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-255Flushing, Filling, Water Treatment and Tie-In to Operating Networks: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-260Energy Centre Commissioning to First Heat Export: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-265Customer Connections and Energy Transfer Station Commissioning: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-270Seasonal Performance Verification, Capacity Proving and Ramp-Up: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-300Commissioning Pre-Insulated Pipe Networks and Leak Surveillance: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-305Commissioning Large Heat Pumps and Heat Source Intakes: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-310Commissioning CHP Plant, Peak Boilers and Electric Boilers: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-315Commissioning Thermal Energy Storage (Tank, Pit and Aquifer): System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-320Commissioning District Cooling Plants and Chilled Water Storage: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-325Commissioning Geothermal Heat Plants and Well Interfaces: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-330Commissioning Waste-Heat Recovery from Industry and Data Centres: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-335Commissioning Network Pumping, Pressurization and Water Treatment: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-340Commissioning Energy Transfer Stations and Heat Interface Units: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-345Commissioning Heat and Cooling Metering, Meter Data and Billing Interfaces: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-350Commissioning Network SCADA, Energy Centre Controls and Dispatch: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | District Energy & Thermal Networks |
| ICXA-422-400Pre-Insulated Pipe Networks and Leak Surveillance: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-405Large Heat Pumps and Heat Source Intakes: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-410CHP Plant, Peak Boilers and Electric Boilers: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-415Thermal Energy Storage (Tank, Pit and Aquifer): Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-420District Cooling Plants and Chilled Water Storage: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-425Geothermal Heat Plants and Well Interfaces: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-430Waste-Heat Recovery from Industry and Data Centres: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-435Network Pumping, Pressurization and Water Treatment: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-440Energy Transfer Stations and Heat Interface Units: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-445Heat and Cooling Metering, Meter Data and Billing Interfaces: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-450Network SCADA, Energy Centre Controls and Dispatch: Checklists and Test RecordsWorking resource | Checklist setDOCX | District Energy & Thermal Networks |
| ICXA-422-510District Energy & Thermal Networks Test Script and Procedure Format: TemplateWorking resource | TemplateDOCX | District Energy & Thermal Networks |
| ICXA-422-520District Energy & Thermal Networks Issues and Deficiency LogWorking resource | ToolXLSX | District Energy & Thermal Networks |
| ICXA-422-530District Energy & Thermal Networks Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | District Energy & Thermal Networks |
| ICXA-422-540District Energy & Thermal Networks Certificates and Release Records SetWorking resource | TemplateDOCX | District Energy & Thermal Networks |
| ICXA-422-550District Energy & Thermal Networks Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | District Energy & Thermal Networks |
| ICXA-422-610Operational Readiness for District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-620Readiness Criteria Library for District Energy & Thermal NetworksWorking resource | ToolXLSX | District Energy & Thermal Networks |
| ICXA-422-630Staffing, Training and Competence for District Energy & Thermal Networks OperationsReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-640Operating Procedures Set for District Energy & Thermal NetworksWorking resource | TemplateDOCX | District Energy & Thermal Networks |
| ICXA-422-650Maintenance, Spares and Asset Data Readiness for District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-660Ramp-Up and Stabilization in District Energy & Thermal NetworksReading reference | GuidePDF | District Energy & Thermal Networks |
| ICXA-422-710District Energy & Thermal Networks Handover Dossier IndexWorking resource | ToolXLSX | District Energy & Thermal Networks |
| ICXA-422-720District Energy & Thermal Networks Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | District Energy & Thermal Networks |
| ICXA-422-810Standards, Codes and Regulatory Map for District Energy & Thermal NetworksReading reference | ReferencePDF | District Energy & Thermal Networks |
| ICXA-422-910Worked Example: A District Energy & Thermal Networks Project End to EndReading reference | Worked examplePDF | District Energy & Thermal Networks |
| ICXA-423-010Applying the ICxA Standards to Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-020Defence & Government Facilities Terminology and Milestone CrosswalkReading reference | ReferencePDF | Defence & Government Facilities |
| ICXA-423-030Roles, Contracting Models and Division of Responsibility in Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-040Defence & Government Facilities Lifecycle and Stage-Gate MapReading reference | ReferencePDF | Defence & Government Facilities |
| ICXA-423-110Defining Outcomes and Outcome Requirements for Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-120Outcome Evidence Need: Worked Examples for Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-130Completion, Performance and Acceptance Tests in Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-140Lender, Insurer and Offtaker Evidence Interfaces in Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-150Outcome Risk and Residual Risk Library for Defence & Government FacilitiesWorking resource | ToolXLSX | Defence & Government Facilities |
| ICXA-423-210Reference System Breakdown Structure for Defence & Government FacilitiesWorking resource | ToolXLSX | Defence & Government Facilities |
| ICXA-423-220Defence & Government Facilities Commissioning Plan: TemplateWorking resource | TemplateDOCX | Defence & Government Facilities |
| ICXA-423-230Defence & Government Facilities Commissioning Sequence and Schedule LogicWorking resource | ToolXLSX | Defence & Government Facilities |
| ICXA-423-240Deficiency Classification: Worked Examples for Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-250Pre-Functional Checks and Construction Completion: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Defence & Government Facilities |
| ICXA-423-255Functional Performance and Integrated Systems Testing: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Defence & Government Facilities |
| ICXA-423-260Acceptance, Placed-in-Service and Real Property Transfer: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Defence & Government Facilities |
| ICXA-423-265Activation, User Fit-Out and Government-Furnished Equipment Integration: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Defence & Government Facilities |
| ICXA-423-270Initial and Full Operating Capability Readiness: Guide and Checklist SetWorking resource | Guide + ChecklistPDF + DOCX | Defence & Government Facilities |
| ICXA-423-300Commissioning Aircraft Hangar Fire Protection: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-305Commissioning Standby Power and Uninterruptible Power Supplies: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-310Commissioning Central Energy Plant and HVAC: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-315Commissioning Building Automation and Facility-Related Control Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-320Commissioning Fire Alarm and Mass Notification Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-325Commissioning Simulator and Training Facilities: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-330Commissioning Airfield Lighting and Apron Systems: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-335Commissioning Telecommunications and Base Network Infrastructure: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-340Commissioning Emergency Operations and Dispatch Centres: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-345Commissioning Naval Shore Facilities and Shore Power: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-350Commissioning Hangar Doors, Ground Support Utilities and Shops: System Guide and ProcedureWorking resource | Guide + ProcedurePDF + DOCX | Defence & Government Facilities |
| ICXA-423-400Aircraft Hangar Fire Protection: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-405Standby Power and Uninterruptible Power Supplies: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-410Central Energy Plant and HVAC: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-415Building Automation and Facility-Related Control Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-420Fire Alarm and Mass Notification Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-425Simulator and Training Facilities: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-430Airfield Lighting and Apron Systems: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-435Telecommunications and Base Network Infrastructure: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-440Emergency Operations and Dispatch Centres: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-445Naval Shore Facilities and Shore Power: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-450Hangar Doors, Ground Support Utilities and Shops: Checklists and Test RecordsWorking resource | Checklist setDOCX | Defence & Government Facilities |
| ICXA-423-510Defence & Government Facilities Test Script and Procedure Format: TemplateWorking resource | TemplateDOCX | Defence & Government Facilities |
| ICXA-423-520Defence & Government Facilities Issues and Deficiency LogWorking resource | ToolXLSX | Defence & Government Facilities |
| ICXA-423-530Defence & Government Facilities Stage-Gate Readiness Review PackWorking resource | TemplateDOCX | Defence & Government Facilities |
| ICXA-423-540Defence & Government Facilities Certificates and Release Records SetWorking resource | TemplateDOCX | Defence & Government Facilities |
| ICXA-423-550Defence & Government Facilities Progress Reporting and Readiness DashboardWorking resource | ToolXLSX | Defence & Government Facilities |
| ICXA-423-610Operational Readiness for Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-620Readiness Criteria Library for Defence & Government FacilitiesWorking resource | ToolXLSX | Defence & Government Facilities |
| ICXA-423-630Staffing, Training and Competence for Defence & Government Facilities OperationsReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-640Operating Procedures Set for Defence & Government FacilitiesWorking resource | TemplateDOCX | Defence & Government Facilities |
| ICXA-423-650Maintenance, Spares and Asset Data Readiness for Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-660Ramp-Up and Stabilization in Defence & Government FacilitiesReading reference | GuidePDF | Defence & Government Facilities |
| ICXA-423-710Defence & Government Facilities Handover Dossier IndexWorking resource | ToolXLSX | Defence & Government Facilities |
| ICXA-423-720Defence & Government Facilities Transfer of Operational Control and Deferred-Work RecordsWorking resource | TemplateDOCX | Defence & Government Facilities |
| ICXA-423-810Standards, Codes and Regulatory Map for Defence & Government FacilitiesReading reference | ReferencePDF | Defence & Government Facilities |
| ICXA-423-910Worked Example: A Defence & Government Facilities Project End to EndReading reference | Worked examplePDF | Defence & Government Facilities |
| ICXA-490-010Case Study: Muskrat Falls (hydroelectric and HVDC, Canada)Reading reference | Case studyPDF | Case Studies |
| ICXA-490-020Case Study: Berlin Brandenburg Airport (Germany)Reading reference | Case studyPDF | Case Studies |
| ICXA-490-030Case Study: Crossrail / Elizabeth Line (United Kingdom)Reading reference | Case studyPDF | Case Studies |
| ICXA-490-040Case Study: Denver International Airport Baggage System (United States)Reading reference | Case studyPDF | Case Studies |
| ICXA-490-050Case Study: Kemper County Energy Facility (United States)Reading reference | Case studyPDF | Case Studies |
| ICXA-490-060Case Study: Vogtle Units 3 and 4 (United States)Reading reference | Case studyPDF | Case Studies |
| ICXA-490-070Case Study: Edinburgh Trams (United Kingdom)Reading reference | Case studyPDF | Case Studies |
| ICXA-490-080Case Study: Ottawa Light Rail Transit Stage 1 (Canada)Reading reference | Case studyPDF | Case Studies |
No resources match your search. Try a broader term or clear the filters.
CHOOSE YOUR ACCESS PATH
Bring the BoK into your professional practice
Explore the public catalogue here, then choose the membership pathway that suits your work. Released resources are accessed through the member area.
Associate
Start with standards previews, research, insights, and introductory resources.
The Associate pathway is an introduction to ICxA. Full BoK access is listed as a Professional and Corporate membership benefit.
Explore Associate membershipProfessional
Access the Body of Knowledge and a licensed copy of the ICxA standards as part of Professional membership.
Use released guidance to develop your practice and check the permissions attached to downloadable tools and templates.
Explore Professional membershipCorporate
Support your organization with BoK access and corporate licensed standards as part of Corporate membership.
Confirm the users, sharing permissions, and organizational use covered by your membership and licence.
Explore Corporate membershipUsing your access
Where do I access the resources?
Log in to your ICxA member account to access the resources included in your membership. The public catalogue helps you identify the document number and title you need.
Can I download, adapt, or share a resource?
Check the format, access permissions, and licence supplied with the resource. Reading access, downloading a working template, and sharing material within an organization can carry different permissions. Contact ICxA if your intended use is unclear.
Build the capability behind better project outcomes
Connect your team’s plans, evidence, and decisions through a shared professional framework.